Laserfiche WebLink
BID SCHEDULE <br />PRE-CONSTRUCTION REMEDIAL ACTMTIES <br />Marion County Courthouse Square Project <br />1 Mobilizarion and Demobilization All LS 2, 400 . 00 TWENTY FOUR HUNDRED 2, 400 . 00 <br /> <br />2 Excavarion, Removal, Decontamination and Disposal of Underground Storage Tank (with Figure 2 identificarion #) <br /> Liu Property Heating Oil UST (#2) All LS 1,100 . 00 ELEVEN HUNDRED 1,100 . 00 <br />3 Soil Excavation and On-Site Stockpiling (with Figure 2 identification #); estimated quantity includes overburden/unsuitable and contaminated <br />materials <br /> Chevron Former Gasoline UST Nest (#6), <br />Chevron Former Used Oil UST (#7), <br />and Beri Lot (#9) <br />Lot (#8) <br />t <br />S 3,430 CY <br /> <br />5. 50 <br />FIVE DOLLARS AND <br />FIFTY CENTS <br /> <br />18 , 865 . 00 <br /> , <br />or <br />ena D R ND <br />4 Unsuitable Material 2,200 TON 5. 50 FIFTY CENTS 12 , 100 . 00 <br /> <br />5 Contaminated Material 2,500 TON 9. 00 NINE DOLLARS 22 , 500 . 00 <br /> <br />6 Transportation of Pre-existing Petroleum <br />Contaminated Soil 5 55- <br />gallon <br />'75 .00 <br />SEVENTY FIVE DOLLAR <br />375 .00 <br />7 <br />Petroleum-Contaminated Water <br />ONE DOLLAR SEVENTY~ ~10,200.00 <br />