My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Pre-Construction Remedial
>
CS_Courthouse Square
>
Construction: Pre-Construction Remedial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:22:23 PM
Creation date
8/9/2011 3:34:50 PM
Metadata
Fields
Template:
Building
RecordID
10105
Title
Construction: Pre-Construction Remedial
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Northern Environmental (PNE) of Longview, Washington, as a construction foremen for <br />projects involving UST installation and decommissioning and soil cleanup. In this <br />position, Mr. Friberg worked on construction projects following plans and specifications <br />for sites branded by major oil companies (e.g., Chevron, Arco, Shell, BP), private <br />petroleum marketers (e.g., Pacific Pride), and governmental agencies (e.g., Trimet). _ <br />Mr. Friberg was employed by IT Corp of Martinez, California, prior to his empfoyment <br />with PNE, working on UST decommissioning and environmental remediation projects. <br />Mr. Friberg also has installed and maintained remediation systems, including product <br />recovery, filtration, and air stripping. <br />Arnold E. Linn Jr. - Field Technician 2 <br />Arnold E. Linn joined BB&A in December of 1996, as a equipment operator. Prior to <br />joining BB&A, Mr. Linn spent four (4) years employed by Pacific Northern <br />Environmental (PNE) of Longview, Washington, as equipment operator for UST <br />installations, decommissioning, and soil cleanup. In this position, Mr. Linn worked on <br />construction projects for sites branded by major oil companies, private petroleum <br />marketers, and governmental agencies. <br />LIABILITY INSURANCE COVERAGE <br />A summary of liability insurance coverage and limits are presented below: <br />^ General Liability <br />Limits: <br />General Aggregate 52,000,000 <br />Each Occurrence S 1,000,000 <br />^ Professional Liability <br />Limits: <br />Aggregate 52,000,000 <br />Each Occurrence 51,000,000 <br />^ Contractor's Pollution Liability <br />Limits: <br />Aggregate 52,000,000 <br />Each Occurrence 51,000,000 <br />^ Automobile Liability <br />Limits: <br />Aggregate 51,000,000 <br />BID PROPOSAL <br />MARION COUNTY COURTHOUSE SQUARE Page 6 <br />SEPTEMBER 19, 7997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.