My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Pre-Construction Remedial
>
CS_Courthouse Square
>
Construction: Pre-Construction Remedial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:22:23 PM
Creation date
8/9/2011 3:34:50 PM
Metadata
Fields
Template:
Building
RecordID
10105
Title
Construction: Pre-Construction Remedial
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SITE SPECIFIC HEALTH AND SAFETY PLAN <br />This health and safety plan has been developed for field activities to be performed at <br />petroleum hydrocarbon release sites and other hazardous material cleanup sites. Field <br />personnel may be exposed to or involved with mechanical excavation and removal of <br />underground storage tanks, contaminated soil and fill materials (soils), backfilling of solid <br />materials, drilling activities, loud noises, harmful airborne contaminants, or other health and <br />safety factors. <br />The purpose of this health and safety program is to provide guidelines and standard operating <br />procedures necessary to ensure the health and safety of on-site workers, the general public, <br />and the environment. Implementation of this program will be the responsibility of the Project <br />Manager. Because the field work is subject to on-site conditions (i.e. weather, unforeseen <br />field conditions, etc.) the plan may need to be modified to accommodate unplanned events. <br />~ The components of this health and safety plan include: pre-entry briefing; site hazards <br />evaluation; personal protective clothing and equipment requirements; field monitoring for <br />~ airborne contaminants; a site layout plan including decontamination procedures; emergency <br />plan; and Plan Review and Daily Health and Safety Log. <br />~ 1.1 Pre-entry Briefing <br />The pre-entry briefing is to bring to workers awareness how the site safetly plan is to be <br />~ followed. The briefing is held at the start of each day prior to initiating any site activity. <br />~ The information is to be completed by the Health and Safety Officer (Project Manager) on a <br />~ daily basis prior to the start of work activities. <br />GENERAL INFORMATION <br />~ Site Name <br />Address <br />~ Euaene, Oreqon <br />Telephone Contact Tien Nquven Eu4ene School District 4J, <br />(541)687-3259 <br />~ i I Mumford <br />Pro~ect Manager Dan e <br />Health and Safety Officer Daniel Mumford <br />~ Date December 14-22, 1995 <br />` Time 0700-1700 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.