Laserfiche WebLink
WILDER ENVIRONMENTAL <br />A Division of Wilder Construction Company <br />For: MARION COUNTY <br />Courthouse Square Project <br />Pre-Construction Remedial Activities <br />TIME AND MATERIAL RATES <br />LABOR PER HOUR (WITH OVERHEAD AND PROFIT) <br />Straight Time/Hour Overtime/Hour <br />ForemanlSuperintendent 48.00 72 <br />00 <br />Operator 45.00 . <br />67.50 <br />Truck Driver 38.00 57.00 <br />Laborer 35.00 52.50 <br />Engineer 50.00 50.00 <br />Project Manager 60.00 60.00 <br />EQUIPMENT Operational $/HR Standby $/HR <br />Pickup 10.00 6 <br />00 <br />1 Ton 15.00 . <br />9.00 <br />Solo Dump Truck 35.00 15.00 <br />JD 450 Dozer 40.00 20.00 <br />JD 850 Dozer 80.00 68.00 <br />CAT D-5H Dozer 70.00 45.00 <br />CAT D-6H Dozer 85.00 60.00 <br />CAT 426 Backhoe 42.00 22.00 <br />Case 580 Backhoe 38.00 22.00 <br />JD 690 Excavator 85.00 60.00 <br />CAT 225 Excavator 90.00 60.00 <br />CAT 229 Excavator 100.00 65.00 <br />CAT 235 Excavator 125.00 100.00 <br />IT 28 Loader 58.00 48.00 <br />CAT 966D Loader 68.00 45.65 <br />CAT 12G Motor Grader 45.07 30.75 <br />CAT 14G Motor Grader 74.33 52.65 <br />Water Truck 4m gallon 40.00 25.00 <br />Vibratory Roller 84" 40.00 30.00 <br />Vibratory Roller 66" 35.00 25.00 <br />Rates for equipment to be utilized on force account work not listed in this schedule will be <br />developed at the site <br />Mobilization/Demobilization will be billed at invoice cost + 10% <br />