My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Pre-Construction Remedial
>
CS_Courthouse Square
>
Construction: Pre-Construction Remedial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:22:23 PM
Creation date
8/9/2011 3:34:50 PM
Metadata
Fields
Template:
Building
RecordID
10105
Title
Construction: Pre-Construction Remedial
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. Special billing rates will be provided as follows: <br />1) Prevailing wage project rates will be deternuned on a project-specific basis. <br />2) Temporary professional personnel not considered in the existing rate structure <br />will be billed at two times base salary and fringe benefits. <br />G. Personnel will be billed at Premium Time on the following holidays. When the <br />holiday falls on a Saturday or Sunday, the holiday will be observed on the preceding <br />Friday or following Monday. <br />New Yeai's Day <br />President's Day <br />Memorial Day <br />Independence Day <br />Labor Day <br />Thanksgiving Day <br />Day After Tl-anksgiving <br />Christrnas Eve Day <br />C}u-istmas Da}• <br />New Yea~s Eve Day <br />II. TRAVEL <br />A. Transportation <br />1) Transportation by commercial carrier will be charged at cost plus 15%. <br />2) Transportation by personal vehicle will be charged at $0.45 per mile. <br />3) Transportation by company vehicle will be charged as listed in Section V7, <br />Vehicles and Equipment. <br />B. Subsistence and Lodgin~ <br />1) Subsistence costs of $30.00 per day per employee will be billed on projects more <br />than 50 miles from our office or when the field work spans two or more meal <br />periods. <br />(Breakfast $7.00, Lunch $9.00, Dinner $14.00) <br />2) Lodging will be charged at cost plus 15%. <br />C. Miscellaneous <br />Tolls, parking, etc. will be charged at cost plus 15%. <br />TII.SUPPORT SERVICES <br />A. Com up ters ~ <br />Field computers will be billed at $40,00 per day. <br />B. Reproduction <br />~pecialized printing or photocopying costs will be billed at cost plus 15% <br />C. Outside Services <br />Other outside support services will be billed at cost plus 15%. <br />TV. SUBCONTRACTORS <br />Subcontracted services will be bi(led at cost plus 15%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.