Laserfiche WebLink
F. Special billing rates will be provided as follows: <br />1) Prevailing wage project rates will be deternuned on a project-specific basis. <br />2) Temporary professional personnel not considered in the existing rate structure <br />will be billed at two times base salary and fringe benefits. <br />G. Personnel will be billed at Premium Time on the following holidays. When the <br />holiday falls on a Saturday or Sunday, the holiday will be observed on the preceding <br />Friday or following Monday. <br />New Yeai's Day <br />President's Day <br />Memorial Day <br />Independence Day <br />Labor Day <br />Thanksgiving Day <br />Day After Tl-anksgiving <br />Christrnas Eve Day <br />C}u-istmas Da}• <br />New Yea~s Eve Day <br />II. TRAVEL <br />A. Transportation <br />1) Transportation by commercial carrier will be charged at cost plus 15%. <br />2) Transportation by personal vehicle will be charged at $0.45 per mile. <br />3) Transportation by company vehicle will be charged as listed in Section V7, <br />Vehicles and Equipment. <br />B. Subsistence and Lodgin~ <br />1) Subsistence costs of $30.00 per day per employee will be billed on projects more <br />than 50 miles from our office or when the field work spans two or more meal <br />periods. <br />(Breakfast $7.00, Lunch $9.00, Dinner $14.00) <br />2) Lodging will be charged at cost plus 15%. <br />C. Miscellaneous <br />Tolls, parking, etc. will be charged at cost plus 15%. <br />TII.SUPPORT SERVICES <br />A. Com up ters ~ <br />Field computers will be billed at $40,00 per day. <br />B. Reproduction <br />~pecialized printing or photocopying costs will be billed at cost plus 15% <br />C. Outside Services <br />Other outside support services will be billed at cost plus 15%. <br />TV. SUBCONTRACTORS <br />Subcontracted services will be bi(led at cost plus 15%. <br />