Laserfiche WebLink
BID SCHEDULE <br />PRE-CONSTRUCTION REMEDIAL ACTIVITIES <br />Marion County Courthouse Square Project <br />1 Mobilization and Demobilization All LS <br />tification #) <br />id <br />2 en <br />Excavation, Removal, Decontamination and Disposal of Underground Storage Tank (with Figure 2 <br /> Liu Property Heating Oil UST (#2) All LS <br />burden/unsuitable and contaminated <br />3 Soil Excavation and On-Site Stockpiling (with Figure 2 identification #); estimated quantity includes over <br />materials <br /> Chevron Former Gasoline UST Nest (#6), <br />Chevron Former Used Oil UST (#7), <br />Senator Lot (#8), and Beri Lot (#9) 3,430 CZ' <br /> <br />4 Unsuitable Material 2,200 TON <br />5 Contaminated Material 2,500 TON <br />6 Transportation of Pre-existing Petroleum <br />Contaminated Soil 5 55- <br />gallon <br />drum <br />7 Petroleum-Contaminated Water 6,000 GAL <br />_ . <br />_ _ <br />_ - _ .~..,.:.~~.t <br />~. <br />