My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Pre-Construction Remedial
>
CS_Courthouse Square
>
Construction: Pre-Construction Remedial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:22:23 PM
Creation date
8/9/2011 3:34:50 PM
Metadata
Fields
Template:
Building
RecordID
10105
Title
Construction: Pre-Construction Remedial
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 02221 <br />EXCAVATION <br />PARTI-GENERAL <br />1.1 DESCRIPTION <br />A. This section covers excavating required for decommissioning or investigating <br />underground fuel storage tanks and for contaminated soil removal or <br />investigations. <br />PART 2 - PRODUCTS <br />2.1 UNCLASSIFIED MATERIAL <br />A. All material, regardless of its nature, excavated from original ground to the <br />bottom of the excavation, which is not otherwise classified in this section. <br />2.2 CONTAMINATED MATERIAL <br />A. All material, regazdless of its nature, from the excavation that contains <br />contaminants above established cleanup levels as determined by the Engineer. <br />B. Pre-existing drummed petroleum contaminated soil. <br />2.3 PAVEMENT REMOVAL <br />A. Asphaltic concrete pavements excavated full depth, not including aggregate base <br />as determined by the Engineer. <br />2.4 CONCRETE REMOVAL <br />A. Portland cement concrete, reinforced or nonreinforced encountered in the <br />excavation as determined by the Engineer. <br />2.5 UNSUITABLE MATERIAL <br />A. Any non contaminated material from the excavation, including overburden soil, <br />that is not used for excavation stabilization as determined by Engineer. <br />2.6 CONTAMINATED WATER <br />A. Water in the underground storage tank as determined by the Engineer. <br />B. Groundwater in the excavation containing contaminants as determined by the <br />Engineer. <br />Excavation 02221-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.