My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Request For Proposal
>
CS_Courthouse Square
>
Construction: Request For Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:25:55 PM
Creation date
8/9/2011 4:32:49 PM
Metadata
Fields
Template:
Building
RecordID
10106
Title
Construction: Request For Proposal
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. EVALUATION CRITERIA <br />Selection sha11 be made on a numerical basis (100 points total) using the following <br />criteria: <br />FIRM QUALIFICATIONS: Is the firm qualified to do the work as defined in <br />the Project Manual, approved by the State of Oregon and City of Salem (as <br />applicable) and appropriately certified to perform the work requested? (25 <br />points) <br />FIRM AVAILABILITY: Does the firm have the staff available to perform the <br />work in a timely manner? (25 points) <br />FIRM REFERENCES: Do the references given by the firm support the data <br />given by the firm? (25 points) <br />FEE PROPOSAL: What is the firms proposed fee, including reimbursable <br />expenses? <br />(25 points) <br />A committee consisting of the following individuals will evaluate the proposals: <br />Billy Wasson, Project Manager - Marion County <br />John Whittington, Project Coordinator - Salem Area Mass Transit District <br />Craig Lewis, Project Manager - Melvin M~rk Development Co. <br />Rick Wessell, Director of Construction - Melvin Mazk Development Co. <br />The Evaluation Committee will evaluate Proposals in accordance with the evaluation <br />criteria set forth above. The evaluation committee may conduct interviews if needed <br />to determine the most qualified firms. All firms to be interviewed will be notified of <br />interviews by telephone. <br />As a result of interviews and proposals, the most qualified firms will be ranked by the <br />committee. Price will be, at most, a secondary criterion for awarding this contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.