Laserfiche WebLink
Alan Chen <br />Name <br />Project List <br />(Project name) (Projects built and <br />(Company name) <br />(Location) <br />Contract Square feet <br />Amount Year Built <br />Building 4 Addition Designed & built 2 story office addition to $4,514,000 41,000 sf <br />Genentech, Inc. existing building. Include interior build-out in <br />South San Francisco, CA new building. Remodel existing building. Hired 1996 <br />and managed architects and engineers. <br />Building 1 Remodel Hazardous material building remodel. $89,734 1,200 sf <br />Genentech, Inc. <br />South San Francisco, CA 1996 <br />Cafeteria Designed & built new cafeteria to serve 800 $1,156,938 7,300 sf <br />Genentech, Inc. people. Hired and managed design team. <br />South San Francisco, CA 1995 <br />Courtyard Link Designed & built landscape courtyard $495,054 18,000 sf <br />Genentech, Inc. connecting two existing buildings that included <br />South San Francisco, CA a pedestrian covered walkway. Hired and 1995 <br />managed design team. <br />Building 25 Designed & built new 3 story office building. $11,168,641 67,000 sf <br />Genentech, Inc. Hired and managed design team. <br />South San Francisco, CA 1995 <br />Building 46 Preconstruction services for fill and finish NA 23,000 sf <br />Bayer, Inc. operation. Manufacturing facility for production <br />Berkeley, CA of biopharmaceutical drug. 1994 <br />Security Headquarters Designed & built security office and new gated $176,000 720 sf <br />Bayer, Inc. entrance to corporate headquarters. <br />Berkeley, CA 1994 <br />Building 4 Remodel Remodel existing office space. Two levels. $2,199,000 23,000 sf <br />Genentech, Inc. <br />South San Francisco, CA 1993 <br />CEO and CFO Offices Construct new offices for chief executive officer $1,850,000 9,000 sf <br />Genentech, Inc. and chief financial officer at Genentech. <br />South San Francisco, CA 1993 <br />Alternate Command Post Relocate emergency earthquake preparedness $400,000 NA <br />Genentech, Inc. trailers. Re-route cables for security, telephone, <br />South San Francisco, CA data, and power. Site landscaping. 1993 <br />projlist 1 5/1/97 <br />