My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition/Abatement Constracts (Folders 1-2)
>
CS_Courthouse Square
>
Demolition/Abatement Constracts (Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:19:28 PM
Creation date
8/10/2011 10:26:15 AM
Metadata
Fields
Template:
Building
RecordID
10111
Title
Demolition/Abatement Constracts (Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DETERMINATION 97-0i CONSTRUCTION TYPE: <br />TRADE <br />nue <br />BASIC <br />HOURLY FRINGE <br />RATE BENEFITS <br />HEAVY-ENTIRE STATE, HIGHWAY-ENTIRE STATE. <br />NON-RESIDENTIAL BLDG. EXCLUDES COOS, CURRY, <br />DOUGLAS & JOSEPHINE COUNTIES <br />BASIC <br />HOURLY FRINGE <br />TRADE RATE BENEFITS <br />Zones for Groups 5, 6 and 7 Carpenters are determined as <br />follows: <br />1. For those workers who reside within zone 1 of a <br />reference city below, their zone pay differential <br />shall be computed based upon the distance from <br />the city hall of that city to the project site. <br />2. For those workers who reside nearer to the project <br />than is the city hall of any reference city below, <br />the mileage from their residence to the project may <br />be used in computing their zone pay differential. <br />3. The zone pay differential for all other projects shall <br />be computed from the city hall of Longview, North <br />Bend, or Portland, whichever is closer to the <br />project. <br />RPfarPnr.P Cities for Grouns 5. 6 and 7 <br />Astoria Eugene Newport Salem <br />Bend Klamath Falls Portland The Dalles <br />North Bend Medford Roseburg ~ongview <br />Grou~2 <br />Auto. Nailing Machine <br />Carpenters <br />Form Stripper <br />Manhole Builders <br />Non-irritating Ins. <br />Cabinet & Shelving <br />installers (wood or steel) <br />Floor Layers & Finishers <br />Stationary Power Saw <br />Operators <br />Wall & Ceiling insulators <br />Irritating Insulation <br />Cement Masons, finishing, hand chipping and <br />patching grouting, end pointing, screed <br />setting, plugging, filling bolt holes, dry packing, <br />setting curb forms, planks, stakes, lines and <br />grades. <br />Composition Workers (includes installation of <br />epoxy & other resinous toppings), and Power <br />Machine Operators. <br />Cement masons working on suspended, <br />swinging and/or hanging scaffold. <br />Cement Masons performing work of both <br />Group 2 and Group 3 at the same time. <br />Zone Differential for Cement Masons <br />(Add to Zone 1 Rate) <br />Zone 2 .65 <br />Zone 3 1.15 <br />Zone 4 1 .70 <br />Zone 5 2.75 <br />. Projects within 30 miles of City Hall in the <br />cities listed below. <br />. More than 30 miles but less than 40 miles. <br />. More than 40 miles but less than 50 miles. <br />. More than 50 miles but less than 80 miles. <br />. More than 80 miles. <br /> Bend Eugene Medford Salem Vancouver <br />Grou~3 Szr~~.~ 4 orvallis Longview Portland The Dalles <br />Millwrights Millwright/Welders I R' DE <br />Machine Erectors (Certified Welders receive <br />Machinists 50.25/hour over Group 3) o Divers 52.34 6.52 <br /> <br />6 <br />G o Divers' Tenders 23.83 6.52 <br />GrouR 5 rouR Depth Pay and Enclosure Pay are added to the <br />Bridge, Dock & Wharf Boom Men Divers' Basic Hourly Rate to obtain the Total Hourly <br />Builders Rate for the diver. <br />Piledrivermen <br /> ASIC HOURLY HOURLY DIVERS' <br />Grou~7 HOURLY + DEPTH + ENCLOSURE = TOTAL <br /> ATE PAY PAY HOURLY PAY <br />Marine Piledriver <br /> <br />CEMENT MASONS Divers' Depth Pay <br /> Depth of Dive Hourly De t~y <br />Zone 1 (Base Rate-: <br /> 50-100 ft ([total ft- 50] x S1.001/hr. <br />o Group 1 2Q.64 6.62 100-150 ft S 50 +([total ft-1001 x 51.50)/hr. <br />o Group 2 21.01 6.62 150-200 ft S125 +([total ft-1501 x 52.00)/hr. <br />o Group 3 21.01 6.62 <br />o Group 4 21.39 6.62 <br />JANUARY 1, 1997 PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.