Laserfiche WebLink
OREGON DETERMINATION 97-01 CONSTRUCTION TYPE: <br />BASIC <br />HOURL'Y FRINGE <br />TRADE RATE BENEFITS <br />>HEETMETAL WORKERS (Continued) <br />Area 1 <br />Benton Gilliam Linn Tillamook <br />Clackamas Grant Marion Wasco <br />Clatsop Harney Multnomah Washington <br />Columbia Hood River Polk Wheeler <br />Crook Jefferson Sherman Yamhill <br />Deschutes Lincoln <br />Area 2 B~~ A~~ Area 5 <br />Baker Morrow Douglas Coos <br />Malheur Umatilla Jackson Curry <br />Union Josephine <br />Wallowa Klamath <br />Lake <br />Lane <br />SOFT FLOOR LAYERS 18.95 5.24 + a <br />a) plus 4% of basic hourly rate for <br />employees with less than one <br />year of service, 6% for those <br />with more than one year. <br />SPRINKLER FITTERS 21.40 6.28 <br />TENDERS TO MASON TRADES 1 a.14 6.00 <br />o Tenders for Bricklayers, Tile <br />Setters, Marble Setters and <br />Terrazzo Workers; Topping for <br />Cement Finishers and Mortar <br />Mixers. <br />(Add 50.50 to base rate for <br />refractory work) <br />(Add to base rate an amount <br />equal to that received for <br />safety belt requirements or <br />other unusual job conditions <br />by the mechanic this worker is <br />tending) <br />TENDERS TO PLASTERERS 1 E3.14 6.00 <br />TILE SETTER/ <br />TERRAZZO WORKER 2~ .33 5.65 <br />(Add 5.50 to base rate if safety belt required by <br />State safety regulations.) <br />(Add $1.00 to base rate if work involves <br />epoxy,furnane, alkor acetylene bl~ick grouting or <br />waterproof inembrane.) <br />HEAVY-ENTIRE STATE, HIGHWAY-ENTIRE STATE. <br />NON-RESIDENTIAL BLDG. EXCLUDES COOS, CURRY, <br />DOUGLAS & JOSEPHINE COUNTIES <br />BASIC <br />HOURLY FRINGE <br />TRADE RATE BENEFITS <br />N R 16.12 4.17 <br />Assists Tile Setters, Brick <br />Layers, Marble Masons, <br />Stone Masons, and Terrazzo <br />Workers by striking, sawing, <br />cleaning, washing or grouting. <br />Does not lay or set any material. <br />(Add 5.50 to base rate if safety <br />belt required by State safety <br />regulations.) <br />(Add S 1.00 to base rate if work <br />invo~ves epoxy, furnane, alkor <br />acetylene black grouting or <br />waterproof inembrane.) <br />(Add 50.75 to fringe for <br />refractory repair work.) <br />K D IV <br />one 1 IBase Ratel: <br />o Group 1 19.62 7.02 <br />o Group 2 19.74 7.02 <br />o Group 3 19.87 7.02 <br />o Group 4 20.12 7.02 <br />o Group 5 20.34 7.02 <br />o Group 6 20.49 7.02 <br />o Group 7 20.69 7.02 <br />ote: A Hazardous Waste Removal Differential must be <br />dded to the base rate if work is performed inside the <br />boundary of a Federally Designated Hazardous Waste Site. <br />or further information on this, call the Prevailing Wage <br />Rate Coordinator at 731-4074. <br />Zone Differential for Truck Drivers <br />(Add to Zone 1 Rate) <br />Zone 2 .65 <br />Zone 3 1.15 <br />Zone 4 1 .70 <br />Zone 5 2.75 <br />n 1• Projects within 30 miles of City Hall in the <br />Cities listed below. <br />n 2: More than 30 miles but less than 40 miles. <br />n More than 40 miles but less than 50 miles. <br />4• More than 50 miles but less than 80 miles. <br />More than 80 miles. <br />r 'i <br />Albany Eugene Longview Portland <br />Astoria Goldendale Madras Port Orford <br />Baker Grants Pass Medford Reedsport <br />Bend Hermiston McMinnville Roseburg <br />Brookings Hood River Newport Salem <br />Burns Klamath Falls Oregon City The Dalles <br />Coos Bay LaGrande Ontario Tillamook <br />Corvallis Lakeview Pendleton <br />JANUARY 1, 1997 PAGE 18 <br />