Laserfiche WebLink
OREGON DETERMINA'TION 97-41 CONSTRUCTION TYPE: HEAVY-ENTIRE STATE, HIGHWAY-ENTIRE STATE. <br />NON-RESIDENTIAL E3LDG. EXCLUDES COOS, CURRY, <br />DOUGLAS & JOSEPHINE COUNTIES <br />E3ASIC [3ASIC <br />HOURLY FRINGE (IOURLY FRINGG <br />TRADE RATE BENEFITS TRADE RATE [3ENEF['TS <br />P4YYEfi~4~1P1~I1I~.P_~RAI4S~(Continuedl QQF~fi~ IContinued- <br />I_UN NE~ <br />4 Muckiny Machinc Operator <br />f Conveyor Operator (any type) <br />A Shield Operator <br />Ei Air Filtration Equipr~~ent Operatar <br />6 Dinkey Operator <br />(i Oiler <br />4 Tunnel Boring Machine Operator <br />W ~ LP1N~__M__A~ H11v ~~ <br />6 Welding Machine Operator <br />U_[~1 Q~F3~iAI~ F3_~4~1 PM~hI <br />2 Underwater Equipment Operator, remoie <br />or atherwise, when used in construrtian work <br />A~1 Al~s±_l.lcontl f~s22 Ar~2lcont) <br />F3aker Multnomah Benton Klamath <br />Clackamas Sherman Coos Lake <br />Ciatsop Tillamook Crook Lane <br />Columbia Wasco Curry Lincoln <br />Jeffcrson Washington Deschutes Linn <br />Gilliam Wh~eler pouglas Mari~n <br />Grant Harney Polk <br />Hood River Jackson Yamhill <br /> Josepiiine <br />Ar_~~ B_rs~~._4 ~r~~?. <br />Malheur Umatilla Morrow <br /> Unian <br /> Waliowa <br />i EETM€TA~ _.~/QfiK €~.~ <br /> <br />ea 1 21 .66 8.49 <br />R44F~~~ <br />1lnstallation and removal ot sheet metal roofing is <br />done by sheetmetal workers.) <br />Area 1: <br />o Raofers 1 J.00 5.30 <br />o Handling coal tar pitch 20.90 5.30 <br />Area 2: <br />o Roofers 17.14~ 5.53 <br />(Add 52.00 per hour to <br />Fringe for work with <br />irritable Bituminous <br />rnaterial.) <br />Arc:a 3: <br />o Roofers 14.£35 4.07 <br />(Add S 1.50 per hour ta <br />Fringe for work with <br />irritable Bituminous <br />i7~aterial.) <br />Area 4: <br />o Roofers 16 OC) 6.05 <br />(Add $2.00 C~er hour to <br />Fringe for work with <br />irritable Bituminous <br />material.~ <br />Area 5 <br />o Roofers 16,92 5.60 <br />(Add S3.00 per hour to <br />Fringe for work with <br />irritable Bituminous <br />material.) <br />(Add S1.00 to base rate for work <br />performed on any swinging platform, <br />swinging chair, ~r swinging ladder) <br />(Add $1.00 to base rate for work with <br />lead or installing material in a plant <br />that uses lead in any form to <br />manufacture a product, (excluding <br />solderingl). <br />(Add $1 .00 to base rate tor work <br />performed in a confined space as <br />defined by OHSA.) <br />~ 2 19.6f 6.15 <br />(Add $1.75 to base rate for work <br />performed wlienever it is possible for <br />worker to fafl 30 feet or more) <br />(Add $1 .75 ta base rate ior work <br />performed in an area where epoxy <br />resins or other injurious chemicals are <br />being applied) <br />4rea 3 <br />23.43 7.25 <br />Add 51.00 tr~ base rate for work <br />where it is necessary to wear a <br />chemically activated face mask) <br />(Add S 1.0~ to I~ase rate for work <br />where employees required to wear a <br />fresh air mask due to nuciear <br />related work) <br />(Add 5.45 to base rate for work on a <br />swinging stage, swinging scaffold ar <br />bosun chair in excess of 30 feet <br />above the ground) <br />rea 4 19.42 5.65 <br />rea 5 19.30 5.77 <br />