Laserfiche WebLink
SECTION 01010 <br />SCOPE OF WORK <br />1.4 DEMOLITION <br />Revise Item C to read: <br />C.It is the goal of the Owner to salvage, recycle, re-utilized or <br />use resource recovery, to the maximum extent practical, materials <br />generated during demolition. The Contractor shall coordinate <br />with the Owner or Owner's Representative, during the demolition <br />of this site, to assure that the materials generated, separated, <br />stored and taken to markets, as part of the demolition, meet this <br />goal. <br />Debris, including masonry, concrete, metals and similar materials <br />shall become the property of Contractor and shall be disposed of <br />off the Site by the Contractor. <br />1.Submit a recycling and resource recovery plan outlining <br />materials to be recovered to meet the Owner's goal. <br />2.Demolishing of the Senator Building shall be done to protect <br />the existing timber beams so that they may be salvaged or reused. <br />Timbers shall become the property of the County. <br />1.8 PROGRESS CLEANING <br />Revise Item B Number 1 to read: <br />1.Collected Waste: Waste shall not to be held on site longer <br />than 5 days. The Contractor shall use the City of Salem's <br />Franchised Solid Waste Hauler to provide for garbage service for <br />protrusible waste. <br />Remove from Item D Number 4 <br />SECTION 01043 <br />PROJECT COORDINATION <br />1.3 PRE-CONSTRUCTION MEETING <br />Add to Item A. Agenda Number 6 to read: <br />6.Discuss plan for what and how materials will be salvaged, <br />re-utilized arid recycled. <br />SECTION 01313 <br />SUBMITTALS <br />1.1 SUBMITTALS AND NOTICES <br />