My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition/Abatement Constracts (Folders 1-2)
>
CS_Courthouse Square
>
Demolition/Abatement Constracts (Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:19:28 PM
Creation date
8/10/2011 10:26:15 AM
Metadata
Fields
Template:
Building
RecordID
10111
Title
Demolition/Abatement Constracts (Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 01010 <br />SCOPE OF WORK <br />1.4 DEMOLITION <br />Revise Item C to read: <br />C.It is the goal of the Owner to salvage, recycle, re-utilized or <br />use resource recovery, to the maximum extent practical, materials <br />generated during demolition. The Contractor shall coordinate <br />with the Owner or Owner's Representative, during the demolition <br />of this site, to assure that the materials generated, separated, <br />stored and taken to markets, as part of the demolition, meet this <br />goal. <br />Debris, including masonry, concrete, metals and similar materials <br />shall become the property of Contractor and shall be disposed of <br />off the Site by the Contractor. <br />1.Submit a recycling and resource recovery plan outlining <br />materials to be recovered to meet the Owner's goal. <br />2.Demolishing of the Senator Building shall be done to protect <br />the existing timber beams so that they may be salvaged or reused. <br />Timbers shall become the property of the County. <br />1.8 PROGRESS CLEANING <br />Revise Item B Number 1 to read: <br />1.Collected Waste: Waste shall not to be held on site longer <br />than 5 days. The Contractor shall use the City of Salem's <br />Franchised Solid Waste Hauler to provide for garbage service for <br />protrusible waste. <br />Remove from Item D Number 4 <br />SECTION 01043 <br />PROJECT COORDINATION <br />1.3 PRE-CONSTRUCTION MEETING <br />Add to Item A. Agenda Number 6 to read: <br />6.Discuss plan for what and how materials will be salvaged, <br />re-utilized arid recycled. <br />SECTION 01313 <br />SUBMITTALS <br />1.1 SUBMITTALS AND NOTICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.