My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Correspondence
>
CS_Courthouse Square
>
Demolition Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:20:52 PM
Creation date
8/10/2011 12:23:51 PM
Metadata
Fields
Template:
Building
RecordID
10112
Title
Demolition Correspondence
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i '` <br />i _ <br />Geotechnical Investigation <br />^ <br />Proposed Courthouse Square - Salem, Oregon <br />7.5 Inspection and Testing <br />1. All backfill and general fill shall be approved by the Geotechnical Engineer. <br />Placement of all fill and backfill should be observed and tested for relative <br />compaction by a qualified technician working under the direction of the <br />Geotechnical Engineer. A suitable testing frequency would be to test every <br />one foot of fill depth as the material is placed. The owner should notify the <br />Geotechnical Engineer prior to the commencement of filling operations. <br />2. All general excavations and footing excavations shall be inspected and <br />approved by the Geotechnical Engineer or his representative prior to <br />placement of any soil backfill or concrete. <br />8.0 LIMITATIONS <br />Exploratory excavations made for this study were placed to obtain a reasonable picture of <br />underground conditions for design purposes. Boring logs depict conditions only at the specific <br />locations explored. Variations from the conditions, not indicated by the borings, are possible. <br />These variations are sometimes sufficient to necessitate modifications in the design. <br />, <br />If unexpected conditions'are observed during construction, or if the size, type, or location of <br />the structures should change, we should be notified to review our recommendations. The <br />professional judgments expressed in this report meet the current standard of care of our <br />profession. <br />Century West Engineering Corporation has performed its services in accordance with <br />generally accepted engineering and consulting standards in effect at the time services were <br />~ performed. Century West makes no other warran , ex ressed or im lied. <br />tY P p <br />~.~ <br />~ <br />~~~ <br />~ centurywest <br />ENGINEERING CORPORATION 11 <br />~ .. March 7, 1997 40806.001.08 <br />t <br />~a <br />l '~ <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.