My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Facilities- Misc. Documents
>
CS_Courthouse Square
>
Facilities- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:57 AM
Creation date
8/15/2011 11:04:31 AM
Metadata
Fields
Template:
Building
RecordID
10132
Title
Facilities- Misc. Documents
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~'larion CountiJ <br />OREGON <br />SUPPORT SERVICES DEPARTMENT <br />Facilities Management Division <br />BOARD OF <br />COMMISSIONERS MEMORANDUM <br />Patti Milne <br />Mike Ryan <br />Randall Franke To: Billy Wasson, Project Coordinator <br /> From: Randy Curtis, Facilities Manager <br />couNnr Subject: Courthouse Square Facility Expenses <br />ADMINISTRATOR <br />Bob Cannon Date: December 1, 1999 <br />DIRECTOR OF <br />SUPPORT <br />SERVICES <br />David M. Hartwig ~ have recalculated the administrative and operational expenses that are <br />FACILITIES attributable to the facilities division. <br />MANAGER <br />Randy Curtis <br /> The calculations on page 2, are based on expenses for the current fiscal <br />Telephone: <br />(503) 58&5154 ea~ and ro ected throu h December 31, 2000. I do not have accurate <br />y {~ ~ g <br /> expense reports that the project incurred for the last fiscal year. <br />Fax: <br />(503) 373-4430 <br /> The salaries for Bob and me, this fiscal year, will total $92,000. These <br />~NisioNS: <br />Business Services sala costs are more than ade uate to account for time that other <br />ry a <br />Faalities facilities staff have put in on the project. <br />Human Services <br />Information Systems <br />Risk Management Our telecom techs, John and Guy, will incur some additional charges this <br /> spring when the building is wired for telecom. We assume these charges <br /> will be billed against the telecom budget category. With the plan changes <br /> that have occurred in recent months, I have asked Bob to review the cost <br /> estimate for telecom equipment and installation. The revised estimate for <br /> our work is $100,000. This does not include Electrical Contractor's pre- <br /> work which should be in the base bid and a related change order. <br />I also anticipate additional charges for office dismantling, reassembly and <br />electrical connections in association with the moves. These costs should <br />be charged to the move-in-cost category. Although it is difficult to <br />estimate these costs since each department's need will be different, I <br />would suggest adding $10,000 to this category. The use of supervised <br />inmates can help control the cost. <br />~ Printed on Recycled Paper Marion County Courthouse -100 High St NE • Salem, Oregon 97301-3670 <br />Reduce Reuse Recycle Recover www.open.org/ma~ion <br />
The URL can be used to link to this page
Your browser does not support the video tag.