Laserfiche WebLink
Marion County <br />Departmental Reallocations <br /> Tenant Tenant <br /> Design Fee by Design Fee by Design Fee by M+ E Desi n M+ E Desi n ~mprovement Improvement <br /> Area in s.f. <br />. <br />; .. <br />, $/s.f. $ls.f. $/s.f. Fee by $/s.f Fee by $/s.f n Cost <br />(Addit e~io <br />n <br />Cost <br />~~~~.~. , <br />, , <br />~~~~.~,`, <br />,,. <br />„ . . <br />Move Neighbor 4o Neighbor from 4th floor to <br /> <br />~ _, <br />~z~ ,~~~>z~ <br />~,..~ F~ ~~~.~ ..:+ ` ~o~o~ ~~ . ~~~a~ <br /><• • ~~>~.~ ~ eductve~ <br />~ <br />~,~~,h, ., `~3:a0 t$. 23:00 <br />~~~ <br />~ <br />7 <br />1 3rd floor <br />Existing N2N space ailocation taken over by 1,000 $ 3,250.00 <br />$ 700.00 <br />; $ 23,000.00 ~~ <br />4 <br />(1 8 2) Support services 594 <br /> Add additional enclosed offices to Support $ (13,662.00) <br />2 Services and expand into former N2N space 1,2g2 $ 4 <br />166 <br />50 <br /> <br />Move Marion CountyHousing Authority from , <br />. $ 897.40 <br />•'._ ~~ $ 29,486.00 <br />3 3rd floor to 5th floor 5,185 $ 16 <br />850 <br />93 <br /> , <br />. $ 3,629.43 <br />~y $ 119,252.76 <br />4 Retain balance of 3rd floor for D.A. expansion 3,842 $ 4 <br />226 <br /> , <br />.20 $ 768.40 <br />' <br />`~ ~ <br />$ (88,366.00) <br />5 Add Space Saver Filing system to D.A.'s office $ 3,900.00 ^ <br /> Relocate Soiid Waste dept to east end of 5th `$ 60,000.00 <br />6 floor <br /> <br />Existing Solid Waste Department Allocation 6,041 $ 25,675.26 <br />$ 4,228.87 , <br />~'3,~ $ 138,948.46 <br />( 3 8 6) taken over by MCHA 5,733 <br />7 Add relites to Legal Counsel's offices $ 350 <br />00 $ (131.855.09) <br />8 Add relites to Assessors offices $ . <br />400.00 <br />$ ~ <br />$ <br />$ 3,450.00 <br />9 Add Conference room to B.O.C. office <br />365 <br />$ <br />1 <br />187 <br />67 °$ 4,312.00 <br /> <br />10 <br />Delete Mail Room from Ground floor <br />2 <br />047 , <br />. $ 255.81 : $ 8,405.06 <br />10 Relocate Maitroom to Franklin Building , <br />2 047 $ 2.251.70 $ 409.40 $ (47,081.00) <br /> <br />Totals ?????7? <br /> $ 30,105.11 $ 25,675.26 $ 6,477.90 $ 1,177.80 $ 9,711.50 <br />~~r~~~s' $ 386 <br />854 <br />29 <br />$ <br />280 <br /> , <br />. ( <br />,964.09) <br /> Deduct Construction Credits $ (280,964.09) <br /> Add Design Fees $ 73,147.57 <br /> Net Additional Cost to the Project $ 179,037.77 <br />