My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interface Engineering- Misc. Documents
>
CS_Courthouse Square
>
Interface Engineering- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:03:40 AM
Creation date
8/15/2011 11:56:07 AM
Metadata
Fields
Template:
Building
RecordID
10244
Title
Interface Engineering- Misc. Documents
Company
Interface Engineering
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Salem Area Mass Transit DistricUMarion County IFB 00-03 33 <br />TAB Services <br />2) The penal amount of performance bonds shall be 100 percent of the original contract price, <br />unless the Recipient determines that a lesser amount would be adequate for the protection of <br />the Recipient. <br />2) The Recipient may require additional performance bond protection when a contract price is <br />increased. The increase in protection shall generally equal 100 percent of the increase in <br />contract price. The Recipient may secure additional protection by directing the Contractor to <br />increase the penal amount of the existing bond or to obtain an additional bond. <br />~ A payment bond is required only when a performance bond is required, and if the use of <br />payment bond is in the Recipient's interest. <br />(d) When it is determined that a payment bond is required, the Contractor shall be required to <br />obtain payment bonds as follows: <br />2) The penal amount of payment bonds shall equal: <br />2) Fifty percent of the contract price if the contract price is not more than $1 million; <br />(ii) Forty percent of the contract price if the contract price is more than $1 million but not more <br />than $5 million; or <br />(iii) Two and one half million if the contract price is increased. <br />Advance Payment Bonding Requirements <br />The Contractor may be required to obtain an advance payment bond if the contract contains an <br />advance payment provision and a performance bond is not furnished. The Recipient shall <br />determine the amount of the advance payment bond necessary to protect the Recipient. If the <br />Recipient requires such bonding after execution of the Contract, then Recipient will pay the <br />reasonable cost of the bond premium. <br />Patent Infringement Bonding Requirements (Patent Indemnity) <br />The Contractor may be required to obtain a patent indemnity bond if a performance bond is not <br />furnished and the financial responsibility of the Contractor is unknown or doubtful. The <br />Recipient shall determine the amount of the patent indemnity to protect the Recipient. If the <br />Recipient requires such bonding after execution of the Contract, then Recipient will pay the <br />reasonable cost of the bond premium. <br />Warranty of the Work and Maintenance Bonds (Construction Contracts) <br />2) The Contractor warrants to Recipient, the Architect and/or Engineer that all materials and <br />equipment furnished under this Contract will be of highest quality and new unless otherwise <br />specified by Recipient, free from faults and defects and in conformance with the Contract <br />Documents. All work not so conforming to these standards shall be considered defective. If <br />required by the Recipient, the Contractor shall furnish satisfactory evidence as to the kind <br />and quality of materials and equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.