My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interface Engineering- Site Visit Report
>
CS_Courthouse Square
>
Interface Engineering- Site Visit Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:04:04 AM
Creation date
8/15/2011 12:05:02 PM
Metadata
Fields
Template:
Building
RecordID
10245
Title
Interface Engineering- Site Visit Report
Company
Interface Engineering
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06%12%2000 MON51~~49 FAS 58--++gARBL1CKI.E C09TICCKLE COSTIC <br />c ~ <br />INTERFACE ENGINEFRING <br />Gcnaulfing Fn9la~ole ~ <br />I~ 002 <br />f~j 002/002 <br />200 Hawthome Ave, $t #~210 <br />Salem, OR 9730) <br />503.364.5354 OFFlCE <br />503.364.5434 FNC <br />Site 1/isit Report <br />~tto~ECr; Courthouse Square Tenant Improvements Pao~ECT NUMBER: 9b-570. I 8 <br />SITE VISIT DATE: 4"' floor 6/6/~0 and 3'~ Floor 6/7/00 517E VISIT NUM6ER <br />ARCHfTECT: Ari~uckle Costic Architects <br />REVIEtivEO sY: Tracy Hokanson and Jeff Karpan <br />PARTIES PRESENT: °Jack° Croughwell <br />^ Mechanical Q Fir~/L'~fe Saf~t.y ^ Plumbing ~ Electrical ^ Other. <br />1TEM <br />NO. ROOM NO./ <br />LOG~TION REMARKS " <br /> <br /> T~I~b FLO R <br />'k~IM~ eMf !IIMB <br />)+-- -7 <br />~ _ <br />~` <br />~ <br />" <br />~ <br />' <br />{ Room 3120 Du lex rece les on north and west walls are not above counter. ` r:~;` <br />` <br />~ <br />~ <br />' <br />2 <br />3 Room 3 I 2 I A <br />Room 3 I 52 No rou -in for floor box. <br />Double du lex rece tacle re ui~s double- an box, <br />. ' <br />4 <br /> <br />5 Room 3 I 8( <br /> <br />Raom 3196 No rou h-in for du lex rece clc on north wal-, <br /> <br />Double du ex r~ce tacle re uires double- an box. ~`' +,~ .:` ~~~ ~~~":?e <br />.-1„~..- - <br />~"~~ ~~x~~:~~':' `~ ~ <br />6 Room 32S I No ro h-in for low votta a snritch on wall north of elevator #3. ~, ~„~~,~.'~ . ~ <br />7 Room 325Z No rou -in for floor box. "-~ "~'~~' <br />6 Room 3258 No rou h-in on north wall for ea~t r+ece cle, `~'- `' ~~t~ <br />9 Room 3288 No rou h-in for wall mounted exit si on rid Iine N l. e ~,' ~' <br /> xvu~w~h <br /> ~ '~a71S' <br /> FOURTH FLOOR " <br />10 <br />I I Room 4157 <br />Room 4176 No rou h-in for floor box. <br />No rou -in for tele hone/data outlet on 9outh wa1L ~y <br />..~,~~~~' <br />12 , <br />I 3 <br />14 Room 4266 <br />Room 4258 <br />Room 4253 No rou in for floor box. ' <br />No rou -in for data on column at Grid N and I 2 ~ <br />No rou -in fnrwall mounted exit si n M and 12, ~S~"~"•~~ ~~ <br />~~';. ,~ <br />"~~~ j ~~ <br /> <br />We are proceedir~g with the project b~ed on the 2bove statemerl~5 being correct. Please notify Interf~ce Engineering. <br />Inc. immediat~eely iFth~re are any corrections or addRions to this documer~t. <br />P:\I 996\96-57Q~COMI"I~Elect 5ite v,sit ReponS.doc Page I of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.