My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interface Engineering- Site Visit Report
>
CS_Courthouse Square
>
Interface Engineering- Site Visit Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:04:04 AM
Creation date
8/15/2011 12:05:02 PM
Metadata
Fields
Template:
Building
RecordID
10245
Title
Interface Engineering- Site Visit Report
Company
Interface Engineering
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/16/2000 11:40 FAX 50~ 581 a655 ARBtiCKLE COSTIC ~ BILLY WASSON I~00~/012 <br />9. Main Lobby <br />1200 -~-hermostat for FPB-1-6 not installed. lnstail the thermostat. Completed <br />10. Office 5209 Thermostat for FPB-5-18 not installed. Install the thermostat. Completed <br />11. East Stair 5256 14 x 6 SG-1 not installed. Install the grille. Completed <br />12. Conference -~-r,ermostat for TU-5-13 not installed. Install the thermostat. Completed <br /> 5252 <br />13. Conference <br />5174 24 x 24 CRG-1 not installed. Install the grille. Completed <br />Site Visit Dated 10/12/00 <br />1_ Stairs - East Overspray of green paint on grilles. <br /> and West <br />2. Breakroom Exhaust grille covered with paper - Remove paper <br /> 2136 <br />DISTRTBUTION: Page 2 of 2 <br />M:\9628\Clerical~Obaervation Reports~Nl+E Punch lists~1VI101300Memo.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.