Laserfiche WebLink
NoteslQuestions Status <br /> <br /> #1 needed. #2 DONE. <br />Commissioning subcontractor. EESI. SuppoRed by ; <br />PECI, Oregon Office of Energy, others. HLA discussed <br />with EESI;' Fred Shaub says he'll be able to meet the <br />documentation requirements Needed• <br />Code compliance forms sent to HLA; forms weren't <br />signed. Need to be signed by "Principal Lighting <br />Designer". DONE. <br />Will use PGE DOE-2 study. Harding currently checking <br />DOE-2 study to assure compliance with #1 -#3. Oregon <br />Office of Energy has provided document #4. Note: DOE- <br />2 study was performed relative to Oregon energy code, <br />not ASHRAE 90.1 (revised). <br />Probably done. (HLA to confirm; PGE will provide other documentation if needed.) <br />11/2/00 8:07 AM Page 12 leed matrix 7 <br />