My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_. _._. _ __~~ _~ ___. _ __ - _ ~ ___~._~__~ ~ ~. <br />MARISA KENDALL - compliance.doc __ _ ` Page 3~ <br />etc. are installed. <br />Credit 1: Advanced Construction IAQ Management Plan <br />Reduce construction contaminants in the building prior to occupancy (e.g. dust, <br />particulates, water infiltration-related contamination, VOC's). Provide a minimum of <br />85% filtration, as determined by ASHRAE Standard 52.1 - 1992, on return-side system <br />components during construction and replace all filtration media prior to occupancy if the <br />return air side of a system is used during construction. <br />The following is a suggested strategy to comply with the intent of this credit. Other <br />strategies that comply with the intent of the credit can also be considered: <br />Comply with the intent of the Basic Construction IAQ Management Plan <br />Reduce construction contaminants in the building prior to occupancy. Make <br />temporary ventilation a requirement in the General Conditions of the construction <br />contract. Check for possible damage to the system from high humidity. Use <br />100°Io outside air ventilation (depending on climate) with air exhausted directly to <br />the outside during installation of finishes and other VOC emitting materials. <br />Check that the maximum outside air ventilation rate does not exceed heating, cooling, <br />and humidity levels. <br />Provide a minimum of 85°Io filtration, if the return air side of an HVAC system is <br />used during construction. Separate filtration media should be specified on any <br />permanent equipment during construction. Just prior to occupancy, new clean <br />media should be installed. All coils, air filters, and fans should be clean before <br />testing and balancing is done and especially before baseline air quality tests are <br />conducted. <br />Credit 4: Design of Chemical Storage Areas <br />Design all chemical storage and mixing areas for housekeeping products (both central <br />storage facilities and janitors closets) to allow for secure product storage in spaces that <br />have water in the chemical concentrate mixing areas, with drains plumbed for the <br />appropriate disposal of liquid waste, separate outside venting, and negative pressure. <br />All storage areas for housekeeping equipment and products should have separate exhausts <br />vented to the outside and should be ventilated and operable under negative pressure. <br />SAFEGUARDING WATER <br />Credit 1: Water-Conserving Fixtures <br />Install fixtures that use 20% less water than the water usage requirements in the Energy <br />' Policy Act of 1992 as follows: <br />Fixture Requirement 20°Io Reduction <br />Showerhead 2.5 gallons/minute* 2.0 gallons/minute <br />Lavatory Fixture 2.5 gallons/minute* 2.0 gallons/minute <br />
The URL can be used to link to this page
Your browser does not support the video tag.