Laserfiche WebLink
Points Points <br />Credit . Description Possible Scored <br />ENHANCING IND OOR ENVIRONMENTAL QUALITY <br />Prerequisite 1 Comply with ASHRAE Standard 62 - 1989, with the <br />Indoor Air proviso that the ambient air quality standard requirements <br />Quality/ shall be site specific, not region specific. Locate building <br />Ventilation/Fresh fresh air intake away from loading areas, building exhaust . <br />Air Intakes fans, cooling towers, and other sources of contamination 0 Achieved <br />Prerequisite 2 Prohibit smoking in all areas of the building <br />Smoking Ban 0 Achieved <br />Prerequisite 3 Comply with ASHRAE Standard 55 - 1992 <br />Thermal Comfort 0 Achieved <br /> Install a permanent air monitoring system that has the <br /> capability to monitor supply and return air and ambient air <br />Permanent Air at the fresh air intake for carbon monoxide (CO), carbon <br />Monitoring System dioxide (C02), total volatile organic compounds (TVOCs), <br /> and particulate (including PM10) 1 <br />Status: Variance granted by LEED Committe~ Installation VOC sensors in return air ducts only. <br />Responsibility: Architect to gat/:er cos! estimates and prepare cost proposal. Design/Development <br />Team to decide wl:ether or not to instal! sensors. <br /> After completion of construction and prior to occupancy, <br />Construction IAQ provision of cleaning requirements for ventilation system <br />Management - components and pathways exposed to contamination during <br />Level 1 construction. Prepare Construction IAQ Management plan. 1 1 <br />Status: Necessary requirements to comply wit/i LEED credit were not included in specifications. <br />Responsibility: General Contractor to estimate cost of complying wit/t credit. <br /> In addition to above requirement, reduce construction <br /> contamination in the building prior to occupancy. If the <br /> return air side of the system is used during construction, <br /> provide a minimum of 85% filtration, as determined by <br />Construction IAQ ASHRAE Standard 52.1 -1992, on return-side system <br />Management - components during construction and replace all filtration <br />Leve12 media prior to occupancy. 1 1 <br />Status: variance granted by LEED Committee. Install 20% air filters on return-side system <br />components and 65% at the unit. <br />Responsibi[ity: General Contractor to estimate cost ojcomplying wit/: credit. <br />Use of Low VOC Adhesives. At a minimum, all adhesives must meet the <br />Materials - VOC limits of South Coast Rule # 1168 by the South Coast <br />Level 1 Air Quality Management District 1* <br />Status: Language is included ii: specs. <br />Responsibility: Arcllitect and HLA to track compliance. <br />Use of Low VOC Architectural sealants. At a minimum, all sealants must <br />Materials - meet Regutation 8, Rule 51 of the Bay Area Air Resources <br />Level 2 Board. 1 * <br />Status: Language is included in specs. <br />Responsibility: Arc/iitect and HLA to track compliance. <br />Use of Low VOC Paints and coatings. At a minimum, all paints and coatings <br />Materials - must meet New Jersey State Department of Environmental <br />Level 3 Protection, Title 7, Chapter 37, Subchapter 23. 1* <br />Status: Language is included in specs. <br />Responsibility: Arclritect and HLA to track compliance. <br />~ <br />