My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` i~ly V1lasson _ , e: L ~ , equirements . ... , ,...... , age <br />> <br />> 1. Scope: (LEED) Advanced Construction Indoor Air Quality (IAQ) <br />> Management <br />> <br />> 2. Use of the rooftop air handling systems during construction will <br />> require the installation of filters at each floor return air entry to the <br />> HVAC shafts as well as at the units as follows: <br />> a. Provide a 30% filter at each Return Air entry to the HVAC <br />> shafts, on each building level, from the ground floor through the fifth <br />> floor. These filters shall be replaced every finro weeks, and additionally as <br />> required by construction operations, during construction of the work. <br />> Filters shall be mechanically attached in a manner to prevent leakage of <br />> ceiling plenum return air past the filter. (Duct tape shall be an <br />> acceptable attachment method.) <br />> b. The filter within each rooftop AC unit shall be a 65% <br />> efficient unit. These filters shall be replaced when static pressure loss <br />> at the filter is 0.5 in. w.g.. <br />> <br />> Let me know if you see a problem with the above <br />> <br />> Leonard Lodder, A.I.A. <br />> Arbuckle Costic Architects, Inc. <br />> 363 State Street, <br />> Salem, OR 97301-3533 <br />> email: Ilodder@arbucklecostic.com <mailto:llodder@arbucklecostic.com> <br />> <br />> -----Original Message----- <br />> From: Joel Stirnkorb [mailto:joelster@teleport.com] <br />> Sent: December 09, 1999 10:33 AM <br />> To: Ilodder@arbucklecostic.com <br />> Cc: jsears@open.org; clewis@melvinmark.com; bcourts@melvinmark.com; <br />> bwasson@opengovt.open.org; bmccullough@open.org; sat@open.org <br />> Subject: LEED Requirements <br />> <br />> Leonard, <br />> I spoke to John Gremmels this morning with Pence Kelly to discuss the <br />> requirements of the LEED credit for the IAQ Construction Management <br />> Plan. He said that the proposal request he recently received only asked <br />> for the cost of air filters, and it did not ask for the cost of writing <br />> and implementing an IAQ Construction Management Plan. In order to <br />> receive the LEED credit, he must write and implement an IAQ Construction <br />> Management Plan. I have sent you a fax that includes the LEED <br />> requirements for your review. John also has a copy of these <br />> requirements. As soon as possible, please amend the proposal request <br />> to include the cost of writing and implementing an IAQ Construction <br />> Management Plan that complies with the LEED requirements. The plan must <br />> be written and in place no later that February 1, 2000 in order for us <br />> to obtain this credit. If you have any questions, please contact me at <br />> (503) 227-1326. <br />> Thank you, <br />> Holly Stirnkorb <br />> Harding Lawson Associates <br />> (503) 227-1326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.