Laserfiche WebLink
Credit Descri tion Point Person Due Date Date Ac uired <br />IMPROVING ENERGY EFFICIENCY <br />Prerequisite Upon completion of the project, provide verif'ication from the local building Leonard Lodder <br />Ener Efficien de rtment that the buildin com lies with state and local ener codes. Holl Stirnkorb <br /> Provide a copy of the commissioning plan along with a signed letter of certification <br />Prerequisite by the commissioning engineer or the respective design engineer(s) confirming <br />Building that the design intent has been achieved. The certification shall be provided on Oliver Raab <br />Commissionin com letterhead of the ce ''n en 'neer. Leonard Lodder <br />Energy Efficiency <br />- Level 1 Provide forms showin com liance with California Title 241i tin re 'rements. Oliver Raab <br /> Simulation results use to show that building design exceed the requirements of <br /> ASHRAE/IES Standard 90.1-1989 and subsequent revisions "Energy Efficiency <br />Energy Eff'iciency Design of New Buildings Except New Low-Rise Residential Buildings" by 20% or Oliver Raab <br />- Leve12 more. Leonard Lodder <br /> Provide a copy of the measurement and verification plan along with a signed letter <br />Bonus Credit of certification by the commissioning engineer or the respective design engineer(s) Holly Stirnkorb <br />Measurement and confirnung that the design intent has been achieved. The certification shall be Oliver Raab <br />Verification rovided on com letterhead of the cert~ 'n en 'neer. Leonard Lodder <br />CONSERVING MATERIALS AND RESOURCES <br /> Provide a highlighted listing of any HVAC/Refrigerant equipment or fire <br /> suppression systems within the e~sting structure(s) that use either CFCs or halon. <br /> Submit a plan of how these e~usting building components will be converted or <br />Prerequisite 1 removed and replaced within the required period, OR provide signed certification Holly Stirnkorb <br />Eliminate CFC's statin that CFC or halon containin ui ment are not used in the buildin . Leonard Lodder <br />Prerequisite 2 <br />Storage and Provide stamped as-built drawing(s) showing ground floor location(s) for <br />Collection of collection and storage of materials separated for recycling. Note locations and <br />Re clables sizes of collecrion and stora e bins hi i ted. Leonard Lodder <br />