Laserfiche WebLink
Pence/Kelly Construction, Inc. Courthouse Square <br />Job No: 99006 <br />ProJect No: 99006 <br />Owner Issue Log <br />Date: 6/24/99 <br />Page: 1 of 3 <br />Number Titte Opened Closed Status <br />00001 Underground Storage Tank Removal 3/18/99 4/29/99 CLO <br />00002 RFI 15; Tendon Locators 4l15/99 NEW <br />00005 Proposal Request #1; Stairwell Vent Plan Review 3/23/99 OUT <br />00006 Proposal Request #2; Electrical Plan Review 3/23/99 OUT <br />00007 RFI 94; Rigid Insul. in cavity wall Conditions 3/23/99 OUT <br />00008 RFI 38; Couplers for Future Building 3/29/99 NEW <br />00009 RFI 58; Area Drains 3/29/99 5/4199 CLO <br />00010 RFI 54; Fibermesh 3/29/99 5/12/99 CLO <br />00011 RFI 82; 5000# mix on footing pads 3/29/99 4/29/99 CLO <br />00012 Proposal Request #4 3/31/99 5/10/99 CLO <br />00013 Gas Conflict at Sewer MH 3/31/99 4/29/99 CLO <br />00014 Remove 3 decommissioned tanks 4/1/99 NEW <br />00015 Proposal Request #3; Standpipe Plan Review 4/2/99 NEW <br />00016 RFI 62; Detail 15/S8.1.5 4/2/99 NEW <br />00017 RFI 1; Addendum 1- Added Electric 4/2/99 5/4/99 CLO <br />00018 RFI 5; Addendum 3, Item 41.A 4/2/99 NEW <br />00019 RFI 33; Dimension Chng on C-2 col. 4/2/99 5/6/99 CLO <br />00020 RFI 34; Column Chng on C-16 col. 4/2/99 NEW <br />00021 RFI 41; Column TerminaGons. 4/2/99 NEW <br />00022 RFI 56; Added ftg dimensions. 4/2/99 5/6/99 CLO <br />00023 RFI 59; reduced col. dimensions. 4/2/99 NEW <br />00024 RFI 83; Incr. trans. bars. 4/2/99 5/6/99 CLO <br />00025 RFI 85; Chng shearvvall dims. 4!2/99 5/6/99 CLO <br />00026 RFI 86; Chng to 8/54.1.3 4/2/99 5/6/99 CLO <br />00027 RFI 93; CMU sealer 4/2/99 5/19/99 Cl0 <br />00028 RFI 96; Brick Lintels 4/2/99 NEW <br />00029 RFI 97; Security grili (c~ air shaft 4/2/99 5/3/99 CLO <br />00030 RFI 103; Beam Depth (a~ Arcade 4/6/99 NEW <br />00031 RFI 107: Detail 1/54.1.3 ftg size. 4/6/99 5/12/99 CLO <br />00032 Proposal request: Water service 4/7/99 5/12/99 UNS <br />00033 RFI 119; Chng to Columns 4l7/99 NEW <br />00034 RFI 37; Slab SVuctural Detail 4/7/99 NEW <br />00035 RFI 120; Column C-22 Schedule 4/7/99 NEW <br />00036 RFI 64; Detail change on S2.2.1 4/7/99 5/3/99 CLO <br />00037 RFI 104/196; Added Column for Bridge 4/7/99 NEW <br />00038 RFI 114; Column Schedule C17 4/7/99 5/3/99 CLO <br />00039 RFI # 44; Handraii (a~ Door Opening 4/19/99 5/3/99 CLO <br />00040 RFI # 161; Doors P296A/S199A 4/19/99 5/3/99 CLO <br />00041 RFI # 129; C16 Column (d1 grid C-12A 4/20/99 5/6/99 CLO <br />00042 RFI # 128; Column type ~ E-5 S2.1.1 4l20/99 5/6/99 CLO <br />OOD43 RFI #730; C-16 column terminations 4/20/99 NEW <br />00044 Remove 2000 gallon tank at Court St. 4/20/99 4/29/99 CLO <br />00045 RFI # 158; Sump Pumps on EI 1&2 4/20/99 OUT <br />00046 RFI # 132; Canopy at grid 13 4/20/99 NEW <br />00047 RFI 89; Glass Block 4/21/99 5/19/99 CLO <br />00048 RFI 126; Struc Hdr detail 3 hr door 4/21/99 NEW <br />00049 Dewatering and Fortnwork at over ex areas 4/27199 APP <br />00050 Contaminated Soil Removal 4/9/99 4/21/99 4/29/99 CLO <br />00051 RF184; Electrical Strike Locations 4/23/99 NEW <br />00052 RFI 164; Columns at A and C Iines 4/29/99 NEW <br />00053 RFI 157; Flr extending on A3.4,3 4/29/99 NEW <br />Repon R_IS ot <br />