Laserfiche WebLink
~7artan Carv,ty <br />OREGON <br />_ Facilities Management <br />Description <br />Wall - mtl studs Gyp Bd. textured <br />Finishes - Painting new drywall walis <br />Finishes - Painting door/frame <br />Finishes - Floor rubber base 4" <br />Elect - receptacles <br />Elect - Lighting switch / rewire <br />Mechanical - supply/return <br />~.. <br />$l3(0 0 <br />Courthouse Square - BOC <br />Wall Enclosure <br />August 3, 2000 <br />Units Quan. tilaterial Labor $ Total <br /> <br />~•f~ ~4 9.00 75.00 $ 1,134.00 <br />s.f. 260 0.80 0.00 $ 208 <br />00 <br />I.s. 1 20.00 67.00 $ . <br />87.00 <br />I.s. 1 75.00 30.00 $ 105.00 <br />ea. 2 18.00 65.50 $ 167.00 <br />ea. 2 6.00 55.00 $ 122.00 <br />I. s. 1 150.00 400.00 $ 550.00 <br />Drawings/coordination ~.s. 1 <br />Permits- Plans review, Building Permit ~.s. 1 <br />Permits- EIecUMech ~.s. 1 <br />Contin enc %total 15% <br />TOTAL <br />Square feet 182.00 <br />Cost per s. f. $18. 72 <br />COMMENTS: <br />No cost estimated for: Special computer connections, telephone equipment. <br />320.00 $ 320.00 <br />120.00 0.00 $ 120.00 <br />150.00 0.00 $ 150.00 <br />$ 444.45 <br />$ 3,407.45 <br />