BOB MCCUNE - IPMVP2.c <br />occupancy, periodic breakdown, etc., and adjusting performance projections as required." <br />4. Post-Installation Inspection Plan <br />A• EESI (as part of commissioning) <br />B• PGE (as part of Earth Smart) <br />From IPMVP: "Site inspection of systems and equipment immediately after construction combined with <br />review of commissioning reports comprises the initial installation verification. The objective is to verify <br />that the installation is in accordance with plans and specifications upon which performance projections aze <br />based." <br />4. Criteria for Equipment Metering, Calibration, and Measurement Period <br />Only metering will be at the utility level? Any sub-metering? <br />9 Level of Accuracy to be Achieved <br />Visual inspection - 100% accuracy, or sampling. (Take from EESI's Commissioning Plan) <br />"Define the level of accuracy to be achieved for all key components." <br />10. Quality Assurance Measures <br />QA measures of DOE-2 model - from PGE <br />QA measures of commissioning - from EESI <br />QA measures of ongoing metering - from Facilities Department <br />11. Reports (contents and schedule) <br />Reports to be prepared by EESI <br />Reports to be prepared by PGE <br />Ongoing reparting, data collection/recording by Facilities Department? <br />Annual reports to be prepared by Facilities Department? <br />Kev questions for Bob McCune and discussion points for 11/16 meeting <br />* Other than EESI's work, does the Facilities Department have any additional plans for verification? <br />* What are the Department's plans for tracking energy use and developing annual savings estimates? Is there <br />or will there be a schedule of reports? <br />* Are there cunently any plans to re-run the energy model (DOE-2)? Under what circumstances? <br />* Please describe the EMS, key inputs and outputs, and how the Department plans to use it. Will there be any <br />system metering or sub-metering? What aze the plans for metering equipment calibration and quality assurance? <br />* What protocols/plan does the Department have for recording changes in building use, set-points, equipment <br />schedules, maintenance, and other changes to the system? Are there any plans for weather/climate monitoring? <br />* Need to discuss (at 11/16 meeting) first year savings estimate and under what circumstances the initial <br />estimate of energy savings would be revised (assuming verification shows significant variance from design). <br />* Need to discuss what threshold triggers a re-evaluation of building energy usage. For example, if energy <br />usage is 10% higher than modeled, do the assumptions and/or energy model need to be revisited? 5%? 20%? <br />2 <br />