My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miscellaneous Correspondence
>
CS_Courthouse Square
>
Miscellaneous Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:28:22 PM
Creation date
8/16/2011 1:46:15 PM
Metadata
Fields
Template:
Building
RecordID
10387
Title
Miscellaneous Correspondence
BLDG Date
1/1/2000
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. NOV.30.1999 4~47PM FIRSTWORLD NW NOeB59 P.7i9 <br />y' . ~..~.:~:,~,~.r~. <br />~'I!1~1~;.~ ,. ~ . <br />F~ RSTW~~ ~~~.D!" <br />FirstWorld Northwest Wor1c Order # <br />Fi~tWorld Northwest Terms and Conditions <br />99-a346riopt1 ~ <br />Date: No~ember 16, 1999 <br />1, FirstWorld NoRhwest wfll implement this in~tailation in axordance with the National Electri~sl Code, Stste and Lacal mandates and wkhin EIA / <br />TIA telecammunicetlons f~stall~tion standards. <br />2. FlrsriNortd Northwest will wamnty this project for one year irom the date of proJea aoceptance Far matefials and labor uNess othe~wise noted in <br />the scope of work <br />3. <br />FrstWorld Northwest assumes that #his work may be performed during normal business hours unless noted otherwise in the swpe of work. <br />4. Frs(World Northwest assumes that no 93bestos wi11 be encount~rEd during this installaHon. This quotatibn does not inciude femoval or <br />abatement of any asbestos or asbectoe contaminatad material~. <br />5. FirsiWorld No~st assumes that all cables will be plaoed above a typical drop ceiling with removable lay-in tiles unless noted othetwise in the <br />soope of worlc. <br />6. FirstWorld Nor~naest assumes that oondidons affeoting this work have not ehanged since the time of our site visitatian. <br />7. FirstWorld Northwest assumes that any oonduits or raceways scheduled for re use during the site walkthrough are of suffiaeM capacity !or the <br />propar.~d pbles and are not d4maged a~ blocked in any way. <br />6, Fir~stWarld Nofthwest assumes that sufficient ratk spaoe and power are available for the listed equipment. <br />8, <br />FirstWorld Northwest assumes~ that there will be unimpEded accESS to all necessary work areas for the duration of the project, <br />10. The astomer is to provlde FfrstWorld Narthwest wlth e Lift Truck for extemal work and a Sassor LiR ~Or intemal work for the du~atiort of the <br />projed unless otherwise noted in the scope of work. <br />19. <br />The custemer will provide a desn and sat,e ernironment for the duration of this projed, 1Nhere applicable, the eustomer will infonn flrstWorld <br />Northwest repreaer~tatives of any hazardous working conditions and provide appropriate tralning and pn~autions <br />~Z~ This quote is ~alid for thirty (30) days irom the date shawn. Fi~stWoNd Northwest reserves the right to adjust this quotation ~Or any phases of this <br />projed that ate scheduled fer completfon beyond sixty (60) days from the date shown below, <br />Project Speafic Additianal Assumptions: <br />Aeeeptence of Terms and Condiqon~ ; <br />Wa~t Mls Gutorner Uuouyb the ebove ten-~ ane meke RloAbeAfforrs or aQCitiOns as neeQed Ne~re fhe Cusfnrne~lnitl~e Dsbw aqreeinQ thet H~e 1un11s ea khfhen or as nwdMea <br />a~o acoepd~bk. <br />Customer Signature Date FirstWorld Inltiels <br />11l30~98 Terms snd Conditions 99-a546r1optl Pege 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.