My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miscellaneous Correspondence
>
CS_Courthouse Square
>
Miscellaneous Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:28:22 PM
Creation date
8/16/2011 1:46:15 PM
Metadata
Fields
Template:
Building
RecordID
10387
Title
Miscellaneous Correspondence
BLDG Date
1/1/2000
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D <br />F <br />Fir <br />10 <br />11 <br />12. <br />:C . 8.1999 9~ 16AM FIRSTWORLD NW N0.160 P.3i5 <br /> Ypµ ~ <br /> <br />~ ',, <br />~• <br /> <br />~ i <br />oate: Decembe~ 8, 1999 <br />~ $T ~ `Q„ FirstWorld Northwest Terms and Conditions I <br />, <br /> <br />s <br />orid Nort <br />west i <br />ork Order # 99-c630 ~ <br /> tWorld N rthwe will impl6ment this installstion in 9ccordance with the National Electrical Code~ State and Loeal mandates <br /> d within EI / TIA~ elecommunications installation standards. <br />, tWo~ld N rwwe will warranty this project for one year from the date of project actept~nce for aterials and labor unless <br /> erwise no in ~ e scope of work <br />~ tWorld N tthwe assumes that this work may b~ performed during norrnal business hours unle s noted otherwise in the <br /> ope of wor . i <br /> <br />stWoAd N <br />rthwe I <br />assumes that no asbestos will be encountered during this ins#allation, This q~lotetion does not indude <br /> oval or a atem t of any asbestos or asdestos contaminated materials. ' <br />, atWorld N nhwe assumes that all cables will be piaced above a typical drop ceiling with remov~ble lay-in tiles unless noted <br /> erwise in t e s e of work. I <br /> stWo~ld N rthwe assumes that conditions affacting this work have not changed since the time df our site vfsitation. <br /> <br />stWorld N <br />rthwe i <br />assumes that any conduits or raceways scheduled for re use during the site w`alkthrough are of suffiaent <br /> paaity tor e pro osed pbles and are not damaged or blocked in any way. <br /> tWorld N rthwe assumes that sufficient rack space and power are a~ailable for tho listed equi~ment, <br /> tWorld N rthwe <br />~ assumes that there will be unimpeded access to all necessary work area3 for he duration of the project. <br /> a custome is to rovide FirstWorld Nvrthwest with a Lift Truck for external wo~lc and a Sassor L' for intemal work for the <br /> ratipn of th proj t unless otherwise noted in the scope of work. <br />~ <br /> e custome will p vide a clean and safe environment for the duratlon of this project. Where appl <br />}cable, the customer will <br />i rm First rtd N rthwest representativas of any hazardous working conditions and provide apprdpNate training and <br /> cautions <br /> is quote is alld r thErty (30) days from the date shown. FirstWorld Northwest reserves the right o adjust this quotatfon for <br /> y phases this jeet that are scheduled for completion beyond si~ciy (6Q) days from the date s own below. <br /> <br />je~t Sp ' <br />c Ad ~ <br />tional Assumptions: ! <br /> <br /> I <br /> <br /> <br /> <br />ptance <br />Te <br />s and Conditions : ~ <br />! <br /> <br /> Ik !he Custom tl~ the aDove terms and Ataks modiAcatiats a adQitians as needed. Nave fhe Cuatomer initialize b agraaing tha~ tl,e terms as <br /> n pr as m lled a coeptaDle. <br /> stomer Sig atu Date <br />i <br />~ <br />~ FirstWorld Initiais <br /> <br /> <br />198 ~ <br />I <br />Terms and Conditions 99-o63Q I <br />~ <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.