Laserfiche WebLink
03~'O1/99 MON 14: ~~ FA~ 503 22a ~606 bIELVIN bIARK _COMPANIES ~~~ , T, ~ <br />~~ 4.4.1.2 Why is excavated soil, frcm remediated areas, required ta be temporarily placed on <br />plastic sheeting? During footing excavation this may work akay in smal! amounts; <br />• howev~r, during mass excavation #he rnaterial would ~eed ta be tested in piace to avoid <br />any double handling of the material. The on~y locations we see that we may be diggfng <br />into remediated areas are where we need to dig the shear waH foctings, <br />We h~ve done projects before that when contaminated soils were discovered and a <br />consultant was hired that supervised the soil remova! process. On this project the crew <br />was not required to be 40 hour frained. My understanding is that whether or not people <br />need to be 40 hour trained dep~nds on the l~vel of contamination. At tlme of bid we did <br />not know the level af contamination and we still don't taday. Is there same reQuirement, <br />other than the one stated in this plan, that states that al~ field workers involved with the <br />contaminated soil are required to be 40 haur trained? I am also concer~ed that if the <br />entire site becomes classffied as a ~ontaminat~d site that everyone on the site may need <br />to have 40-hour training. Also, if contam+nat~d soil is discovered it woutd need to be <br />rerr~oved and backfiHed to a point that would remove any potential requirement for the <br />workers of trades involved with building the building to be 40 hour trained. <br />I do not understand the last sentence in this psragraph. <br />A~•4,2 Who does this work7 <br />Safety plan <br />1.0 1 do ~ot want the safety officer directing the work. ~ <br />2.Q What doees it mean when it says the p~oject ma~ager will have final say as to the <br />• implementation of the site HASP? <br />To tr~in a(I people that are an site is expensive and nat in our contract prfce. <br />The rest of this whole plan needs to be combed through in anather meeting. <br />Sampling plan <br />Th~ sampling p(an must nat interrupt workffow. Two-day wait on lab results is not acceptable. <br />C~ ooa <br />r. 02 <br />~formslmemc <br />