My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Note Book: Miscellaneous (2)
>
CS_Courthouse Square
>
Note Book: Miscellaneous (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:41:00 AM
Creation date
8/17/2011 1:21:47 PM
Metadata
Fields
Template:
Building
RecordID
10405
Title
Note Book: Miscellaneous
BLDG Date
12/12/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AtiG-16-99 MON 08:50 HARRIS REBAR SEATTLE FAY, N0. ]2532727256 P,O1 <br />~ <br />U <br />• ' <br />HA~S ~EBAR <br />SEATTLE, INC. <br />' # 326 - ~01 Atcxander Ave <br />, Tacam~, WA. 98422 <br />' Tamma Phone : (l,$3}271-42Z7 Faa : (253)-272-i256 <br />Call : l- 888 - 60 • l4EB.4R <br />C& J Rebar Au~ust 1;, t9.99 <br />4121~ SL Intcmational Way <br />Suitt # A] 1 l <br />~iiiwaukcc QR 97222 <br />Atteption: Kon ltiley By Fa1-: 503-353-0249 <br />Re: ' Foreign Stoel <br />Court3iousc Square, Salem OR <br />Deax R.~r~ <br />As vou know, it f rst came to auur attention that the Courthouse Squ~ project had Buv A.merica <br />resMctions last week, As soan ~s we hcard this, we r+eviewed a11 project documents, plaz~s, and <br />specificatiot~s in our possession to confirm this and could fiad no indication of Buy America. <br />Wc ~ssumc tkat rcfercncc is made in docuaacnts not in our possession and havc takeu steps, <br />effe~tive last week, to prevtnt a~y ~artbar delivcry of forcign stcei to tiu,s projact. AU fabrication <br />tags ~'or this project ase now m,~rked to ensure campliance with Suy Amcrica. <br />LJafortunately, no such controls were in place before last wc~k. We acnow that some foreign steel <br />was delivet~ed to the pro}cct sad, wc assumc, incorporar~d imo the structure. ~Iowcvcr, it is <br />extremely diffsault ta fletermine exact~y how much. QV~ r~re attempt tv arrive at a guess sutGe we <br />hav~ thc following irtformation: <br />; 1. In i998. we purchasod $ rela,tiveiy small quandty of~ 3. # 4 and # 5 fo;eigti rebar in <br />order to prevent shortagcs in supp3y of small size rebar ttist we anticipated dvring th~ <br />' busy 1999 constructicn season. Therefvre, any bar supplied is limitcd to anc af these <br />three bar sizes. <br />' 2. Alt foreign ba; purchasad is shorter thaa t~e normal domestic mill bar lcagrh w~ich <br />fazt~~er litvits its us~. <br />, 3. Almost oll ~ 3, # 4 or # 5 rebar that is bcnt is bcat ot~ our automatic bcndcr that <br />' utilizes coil stock rebaz that is only produced domestiealty. This farther rrduces the <br />' potentia: us2~ge of foreign stael. <br />; 4. Consu~ting our estimate summary of rcb~r sizcs, lcngths end i~cnding on this projcct <br />to date shows: <br />- I'vtal Tons to be supplied will be ap~proxunauly 800. <br />: - About 45% of the totat work to be supplied is #3. #4. or RS (360 tons) <br />- Niost of thc foundation work supplied to datc iavolves larger bar sizes <br />, {thc avcrage bar size dmps as the pro}oct progresscs). Of the 45% total, <br />' wa cstimat~ vnly about 25% is in th~ portion ef tbc work shipped to date. <br />(90 tons) <br />- About SO% of this baz is nrai,~ht. (45 tons) <br />- Abc~ut 5,5 % of this bar is "stock" wcight i.e. )cr~gths longer than f.orei.g~ <br />sceel wpu2d pcrn~it. (20 tons) <br />
The URL can be used to link to this page
Your browser does not support the video tag.