Laserfiche WebLink
12/8/99 <br />Courthouse Square <br />Pending COR's <br />COR PROPOSED AMOUNT DESCRIPTION OF CHANGE STATUS <br />COR #40 ($3,830.00) Allowed changes in fire rating Pending Resolution <br />COR #90R $5,971.00 Provide T.S. shaft columns ~ elevator #3 per RFI's 143, 311, 321 Pending Review <br />COR #97R 316.00 <br />$77 Provide additions and revisions to the traffic signalization plan per PR #11 Pending Resolution <br />#104 , <br />$1,331.00 Provide ceiling above trash room per RFI 329 Pricing To Be Revised <br />R#10 853.00 <br />$80 Provide and install space saver filing system per PR #41 Pending Review <br />COR #106 , <br />$784.00 Provide additional rebar at GF per RFI 314-PT cable already on site Pricing To Be Revised <br />COR #120 $4,859.00 Provide sandblast finish at exterior stairs per PR #49 Pricing To Be Revised <br />COR #131 R $2,455.00 Provide transformer sled per PR #162 Pending Review <br />COR #135 $905.00 Provide modified sequence of operation for AC-4 per RFI 284 Pending Review <br />COR #137 $6,112.00 Provide changes to pumps P-2 and P-3 per PR #47 Pending Review <br />COR #138 482.00 <br />$4 Provide modification to ductwork at canopy braces per RFI 338 Pending Review <br />COR #139 , <br />555.00 <br />$7 Provide Mortar Net and Perma Barrier per RFI 366 - Pricing To Be Revised <br />COR #142 , <br />$2,240.00 Provide aluminum tube filler where stud walls terminate at windows per RFI 390 Pricing To Be Revised <br />COR #146 $36,335.00 Provide tra~c deck coating system on surface of north end opportunity site Pending Review <br />COR #148 $1,039.00 Provide ledger angle per RFI 403 Pending Review <br />Pricin To Be Revised <br />9 <br />R#15 581.00 <br />$96 Provide access control system <br />COR #154 , <br />$529.00 Provide fire/ smoke damper per RFI 417 Pending Review <br />COR #156 $5,298.00 Provide condensate drains to sanitary per RFI 412 Pending Review <br />COR #159 168.00 <br />$6 Provide angle for 6" studs per RFI 408 Pending Review <br />COR #160 , <br />$655.00 Provide brick support above louver per RFI 283 Pending Review <br />COR #161 324.00 <br />$1 Provide access panels for tower clocks per PR #58 Pending Review <br />COR #162 , <br />$653.00 Provide changes to plenum wall in P 198 per Interface Fax dated 11/29/99 Pending Review <br />COR #164 $13,254.00 Provide window and door flashing modifications per PR #57 Pending Resolution <br />COR #167 $1,609.00 Provide graphic to Solid Waste Department Carpet per PR #72 Pending Review <br />COR #170 $2,163.00 Provide automatic hand dryer upgrade per PR #66 Pending Review <br /> $356,641.00 Pending COR Subtotal <br />* COR #115 includes a delay claim o f 8 working days caused by changes in COR's 115 and 64 <br />