Laserfiche WebLink
<br />O 2000 <br />Act <br />ID Descriptlon rig <br />Dur Rem <br />D <br />r Early <br />St <br />rt Early <br />Fi <br />i <br />h JAN FEB MAR APR MAY JUN JUL AUG E <br /> u a n <br />s <br />~`s~rRJ ;-~2nd,thru ~Roof grld J~~thru O ~:~ ~~v~,e~x<au,". ' ~ ^ " ~~ <br />~ 5617 metai stud framinglwall sheeting 9 9 24JAN00 03FEB00 metal stud framing/wall sheeting <br />" 5627 brick veneer 13 13 10FE800 28FE600 ~7 brick veneer <br />5637 window systems 5 5 29FEB00 06MAR00 67 window systems <br />~~ 5647 caulking 4 4 07MAR00 10MAR00 m caulking <br />~ 5657 clean & seal masonry 4 4 29FEB00 03MAR00 m Gean 8 seal masonry <br />5667 pedestrian canopies 3 3 13MAR00 15MAR00 1g pedestrian canopies <br />~' S677 ceramic tile <br />~ : ~• <br />B~O` a~king~~e~v ~~~,Under Bu 1 i g <br />~ . ~~;,~ ~~ ~ ~~ 3 <br /> <br /> <br />~: : 3 <br /> <br /> <br />~, ~: 16MAR00 20MAR00 m ceramic tile <br />° 5621 semi - rigid insulation along south side 3 0 060EC99 A 09DEC99 A i- rigid insulation along south side <br />~ <br />~ 5625 fire sprinkler system 35 0 140CT99 A 01 NOV99 A er system <br />~ 5645 piumbing rough-in 16 0 110CT99 A 260CT99 A u h-in <br />3 5655 hvac rough-in 7 7 18JAN00 26JAN00 hvac rough-in <br />~~ 5665 electrical rough-in 3 3 19APR00 21APR00 LQelectrical rough-in <br />#: 5675 non-bearing masonry walls 7 0 190CT99 A 270CT99 A ~ asonry walls <br />5680 install elevators 60 60 21JAN00 13APR00 i/ install elevators <br />5685 metal stud framing 3 3 14APR00 18APR00 m metal stud framing <br />5695 drywail, tape & texture 5 5 19APR00 25APR00 ~7 drywail, tape & texture <br />, 5715 doors, frames & hardware 5 5 26APR00 02MAY00 ~7 doors, frames 8 hardw <br />,> 5720 painting 4 4 03MAY00 08MAY00 67 painting <br />5725 light fixtures 10 10 11 FEB00 24FEB00 ~7 light fixtures <br />5735 coiling doors 2 0 05JAN00 A 05JAN00 A c oiling doors <br />5745 striping 3 3 12JUN00 ` 14JUN00 LY striping <br />5755 security gate 2 2 26MAY00 30MAY00 m security gate <br />5765 <br />A <br />5775 <br />6000 signage <br /> <br />mechanical, fire, electrical <br />Fire Rough-i~ 5 <br /> <br />20 <br />5 5 <br /> <br />20 <br />0 15JUN00 <br /> <br />13MAR00 <br />260CT99 A 21JUN00 <br /> <br />07APR00 <br />23NOV99 A ~7signage <br /> <br />~ mechanical, fire, electrical <br />ough-in <br />6010 Plumbing Rough-in 12 0 190CT99 A OSNOV99 A Rough-in <br />6020 hvac rough-in 10 0 290CT99 A 10DEC99 A c rough-In <br />6030 electrical rough-in 10 1 08NOV99 A 18JAN00 electriql rough-in <br />6035 metal stud framing full height walls 4 0 08NOV99 A 08DEC99 A 1 stud framing full height walls <br />6037 plumbing wall roughin 3 0 02DEC99 A 06DEC99 A b ing wall roughin <br />6040 sheetrock and fire tape ceiling section 4 4 11 FEB00 16FEB00 • sheetrock and fire tape ceiling sectio <br />6045 grid ceiling 3 3 17FE600 21FE800 ~grid ceiling <br />6050 frame partion walis 3 3 22FEB00 24FEB00 ~ frame partion walls <br />6055 drywall 4 4 25FE600 01 MAR00 ~ drywall <br />6060 tape 4 4 02MAR00 07MAR00 67 tape <br />6065 texture 2 2 08MAR00 09MAR00 14 texture <br />6075 paint 9 9 10MAR00 22MAR00 ~ paint <br />6100 fire sprinkler drops 3 3 22FEB00 24FE600 L4 fire sprinkier drops <br />6110 light fixtures 5 5 23MAR00 29MAR00 ~7light fixtures <br />6180 ceiling tile 3 3 30MAR00 03APR00 m ceiling tile <br />6185 doors and hardware 4 4 30MAR00 04APR00 67 doors and hardware <br />6190 casework 5 5 30MAR00 05APR00 a7 casework <br />6195 flooring at TI spaces 3 3 06APR00 10APR00 m flooring at TI spaces <br />6200 wood trim 5 5 25MAY00 01JUN00 Q7 Wood trim <br />6210 ceramic tile at cooridors 3 3 02JUN00 06JUN00 m ceramic tile at cc <br /> o.va.u ,e~~r,oo <br />RunCats 20JANW <br /> <br />I <br />il <br />C <br />i $tarl CeM 151d~R98 <br />"""`""'""'" <br />on, <br />nc. <br />y <br />onstruct <br />PencelKe Pa e numEa, t0A <br />O Rinwsra 3 s1mn. ~nc. ~ <br /> <br />