Laserfiche WebLink
Kim Arbuckfe, AIA <br />Alan E Cos[ic, A(A <br />Walter E Bensman, Jr_, AfA <br />C~ayron Vorse, AIA <br />Mark M Fos[er, AIA <br />Leonard Lodder, AIA <br />Richard S- Ro[hweiler, AIA <br />July 17, 1998 <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, OR 97301-3533 <br />503/58I-4114 Fax: 503/581-3655 <br />E-Mail: acarchQopen.org <br />Craig Lewis <br />Project Manager <br />Melvin Mark Development Company <br />111 SW Columbia, Suite 1380 <br />Portland, Oregon 97201 <br />RE: Design Development Documentation <br />Courthouse Square <br />Project No. 9828 <br />Dear Craig: <br />This letterwill confirm our telephone conversation of this moming in reference to the drawings provided by <br />Interface Engineering for 50°~ Design Development. We note that the documentation provided does not <br />show very much in terms of systems. However, the documents do represent a significant effort in terms of <br />sheet preparation for Design Development and Construction Documents. In addition, i am aware that <br />Intertace Engineering has material in the form of system design notes and calculations which do not show <br />up on documents, but form the bulk of their effort to-date. <br />Please note that our structural and civil consultants find themselves in much the same position. Unlike <br />Architedural Design Development which can be measured in the form of progress on drawings, engineering <br />progress is measured by notes and calculations. <br />Trusting this answers your concerns, I remain, <br />Yours S' cerely, <br />Leonard Lodder, A.I.A. <br />Architect <br />LL:aI <br />cc: John Whittington <br />. . f ~~ .i~~~ <br />9828.3A <br />~3EC~EIVED <br />~;UL 2 y ~94~ <br />raRION COUNTY CORRECTION:. <br />WOR~ CENTER <br />