Laserfiche WebLink
Courthouse Square Architectural Cost Consultants, LLC Estimate Dale: R 03-Dec-98 <br />Couf~ 8 High Stf2et James A. Jerde, AIA - Slanley J.. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Da~e: 03-Dec-98 <br />Arbuckle Coslic Archilects, Inc Portland, Oregon 97221 Pnnt Time: 11:07 AM <br />50°k CoNract Documenls Eslimale Phone (503) 297-7210 Fax (503) 297-7187 Conslruction SIaA: Spring 99 <br />DIRECT CONSTRUCTION COST SUMMARY <br />Component I Area $/ SF Cest <br />Building Shell & Core 152,792 sf 74.35 11,360,691 <br />Parking 71,979 sf 46.29 3,331,929 <br />Bus Mall 66,528 sf 32.70 2,175,371 <br />Subtotal 224,77~ sf 75.05 $16,867,991 <br />Streetscape 35,650 sf 50.20 1,789,777 <br />Subtotai 35,65o sf 50.20 $1,789,777 <br />Tenant Finishes <br />Ground Level Tenant Finishes 13,916 sf 53.04 738,116 <br />Second Floor Tenant Finishes 27,462 sf 29.79 818,119 <br />Third Floor Tenant Finishes 28,062 sf 17.19 482,342 <br />Fourth Floor Tenant Finishes 28,062 sf 15.69 440,414 <br />Fikh Floor Tenant Finishes 16,824 sf 25.91 435,949 <br /> 114,326 sf 25.50 $2,914,941 <br />TOTAL DIRECT CONSTRUCTION COST $21,572,708 <br />Indicated Surplus / (Deficit) (21,572,708) <br />ALTERNATES <br />7 Parking Alternate 1 22,092 sf 44.73 Add t 988,271 <br />2 Parking Alternate 2 19,467 sf 43.66 Add t 849,921 <br />30 ~ <br />40 ~ <br />Comments <br />The above estimates are for direct construction cost only. They do not include furnishings & equipment, consultanl <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any <br />other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major <br />sub-trades as well as ihe general contractors. All work to be contracted at one time (shell & core, street & bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The estimate includes a 1.5% estimating contingency. (drawings and details are not complete, complete specifications <br />not provided for this estimate). <br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed <br />beyond the date above, the eslimates must be indexed at a rate of 2 to 4% per year compounded. <br />Summary - Page 1 <br />