								    Courthouse Square		Architectural Cost Consultants, LLC	Estimate Dale:	R 03-Dec-98
<br />Couf~ 8 High Stf2et		James A. Jerde, AIA - Slanley J.. Pszczolkowski, AIA	Document Date:	29-Oct-98
<br />Salem, Oregon		6441 SW Canyon Court, Suite 103	Print Da~e:	03-Dec-98
<br />Arbuckle Coslic Archilects, Inc		Portland, Oregon 97221	Pnnt Time:	11:07 AM
<br />50°k CoNract Documenls Eslimale		Phone (503) 297-7210 Fax (503) 297-7187	Conslruction SIaA:	Spring 99
<br />DIRECT CONSTRUCTION COST SUMMARY
<br />Component I Area $/ SF Cest
<br />Building Shell & Core	152,792 sf	74.35 11,360,691
<br />Parking	71,979 sf	46.29 3,331,929
<br />Bus Mall	66,528 sf	32.70 2,175,371
<br />Subtotal	224,77~ sf	75.05 $16,867,991
<br />Streetscape 35,650 sf 50.20 1,789,777
<br />Subtotai 35,65o sf 50.20 $1,789,777
<br />Tenant Finishes
<br />Ground Level Tenant Finishes	13,916 sf	53.04	738,116
<br />Second Floor Tenant Finishes	27,462 sf	29.79	818,119
<br />Third Floor Tenant Finishes	28,062 sf	17.19	482,342
<br />Fourth Floor Tenant Finishes	28,062 sf	15.69	440,414
<br />Fikh Floor Tenant Finishes	16,824 sf	25.91	435,949
<br />	114,326 sf	25.50	$2,914,941
<br />TOTAL DIRECT CONSTRUCTION COST		$21,572,708
<br />Indicated Surplus / (Deficit) (21,572,708)
<br />ALTERNATES
<br />7 Parking Alternate 1 22,092 sf 44.73 Add t 988,271
<br />2 Parking Alternate 2 19,467 sf 43.66 Add t 849,921
<br />30 ~
<br />40 ~
<br />Comments
<br />The above estimates are for direct construction cost only. They do not include furnishings & equipment, consultanl
<br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any
<br />other normally associated development costs.
<br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major
<br />sub-trades as well as ihe general contractors. All work to be contracted at one time (shell & core, street & bus mall and
<br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added.
<br />The estimate includes a 1.5% estimating contingency. (drawings and details are not complete, complete specifications
<br />not provided for this estimate).
<br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed
<br />beyond the date above, the eslimates must be indexed at a rate of 2 to 4% per year compounded.
<br />Summary - Page 1