Laserfiche WebLink
JUN-13-97 FRI 12~10 PENCE KELLEY FAX N0, 15035857477 P,02/02 <br />Courthouse Square I~ <br />Bus Mall Costs <br />Drawings Dated 5/30/97 <br />223,988.00 <br />Steel at atrium <br />74,390.00 <br />Waterproofing 1 under slab <br />Island Curbs 7,504.00 <br />50,394.00 <br />Extra concrete floor thi~kness <br />Topping slabs 170,474.00 <br />170,288,00 <br />Brick pavers <br />Tile on walls 61,000.00 <br />Electrical 50,000.00 <br />Cost to make building 18' 1'' floor in lieu of 15' 144,000.00 <br />Skylights 352,685.00 <br />Security grill doofs 162,316.00 <br />Paint at bus shelters 40,000.00 <br />Sprinkler system 35,~00.00 <br />80' span for bus traffic 398,600.00 <br />Charcoal filters at HVAC units for bus mall 100,000.00 <br />Infra-red Heat 63,000.00 <br />Soffit under drive through structure 80 ~~0 <br />Subtotal 2.184,279.00 <br />General Conditions 131,057.00 <br />P&O 13~920•00 <br />TOTAL BUS MALL COSTS 2,45~,256,00 <br />Revised 6/13/97 <br />