My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Space Planning (Departments)
>
CS_Courthouse Square
>
Space Planning (Departments)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:12:23 AM
Creation date
8/18/2011 5:07:54 PM
Metadata
Fields
Template:
Building
RecordID
10288
Title
Space Planning (Departments)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JUN-13-97 FRI 12~10 PENCE KELLEY FAX N0, 15035857477 P,02/02 <br />Courthouse Square I~ <br />Bus Mall Costs <br />Drawings Dated 5/30/97 <br />223,988.00 <br />Steel at atrium <br />74,390.00 <br />Waterproofing 1 under slab <br />Island Curbs 7,504.00 <br />50,394.00 <br />Extra concrete floor thi~kness <br />Topping slabs 170,474.00 <br />170,288,00 <br />Brick pavers <br />Tile on walls 61,000.00 <br />Electrical 50,000.00 <br />Cost to make building 18' 1'' floor in lieu of 15' 144,000.00 <br />Skylights 352,685.00 <br />Security grill doofs 162,316.00 <br />Paint at bus shelters 40,000.00 <br />Sprinkler system 35,~00.00 <br />80' span for bus traffic 398,600.00 <br />Charcoal filters at HVAC units for bus mall 100,000.00 <br />Infra-red Heat 63,000.00 <br />Soffit under drive through structure 80 ~~0 <br />Subtotal 2.184,279.00 <br />General Conditions 131,057.00 <br />P&O 13~920•00 <br />TOTAL BUS MALL COSTS 2,45~,256,00 <br />Revised 6/13/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.