Laserfiche WebLink
~Ir~' s' ; 'w~-` <br />~_ <br />CAPITAL CIT![ ~PE~ <br />~ <br />- . s~ <br />OBDER CHl~i~IGE FOBPI ft; <br />"~ <br />Gv' <br />CQSTOMEBS NAIlE Marion County Court B/L N0. <br />3522 <br />F$L~I Senator Building TO Franklin Building <br />BEASON(S) F08 CHANGE: (No. 1) Racking was quadruple bolted, rather than <br />two bolts holding the section together there were sometimes eight. It took <br />4 times as long to dissassemble. (Add 2 days) <br />(No. 2) Franklin Building had to be reconfigured <br />because the original measurements did not take into account the pillars. <br />Much of the racking was diverted to the Court House basement and the Court <br />House basement was then reconfigured to accept the new rackinQ. (Add 2 days) <br />(No. 3) New racking was purchased, delivered, <br />unloaded and assembled. (More has been ordered) (Add 1 day) <br />(No. 4) New files from Court House had to be worked <br />into new configuration before old files could be moved in. (Add l day) <br />COST EFFECT: 6 extra days $8336.00 <br />v2 - ~a- ~ ~ <br />