Laserfiche WebLink
8-30-1 99° 1 0= 2dP~ 1 FROP•1 CENTURYG'~EST 1 5035°91 657 <br />~ <br />Work Order 9 CLOSED OUT <br />Liu Asbestos Surve 52.500 <br />WO 9 Cost Summa 52,600 <br />Work Order 10 CLOSED OUT <br />Goodman Asbestos Surve 52,500 <br />WO 10 Cost Summa $2,500 <br />Work Order 11 CLOSED OUT <br />Marion Court Asbestos Surve 515.796 <br />WO 1'I Cost Summa 515,79B <br />Work Order 12 CLOSED OUT <br />Hazardous Waste Surve $12,458 <br />WO 12 Cost Summa $12,488 <br />Work Order 13 <br />Environmental Pro ram Mana ement $30,956 <br />WO 13 Cost Summa E30,856 528 306 52.650 <br />Work Order 14 Not A licab{e <br />ENVIRONMENTAL SUPPORT OF DEMOLITION <br />WO 14 Cost Summa <br />Work Order 15 CLOSED OUY <br />AsDestos Abatemertt Technical Guide. S6,210 <br />WO 1fi Cost Sumrtla S6,210 <br /> <br />Wock Order 17 <br />WASTE MAfVAGMENT PLAN $10 826 Not a licabfe <br />WO 17 Cost Summa $10,826 <br />Work Order 18 <br />Statesman .lournal Issues $12 640 <br />WO 16 Cost Summa 512,6d0 S323 $12,J17 <br />Work Order 19 <br />Im cted Soil Ezcavation Plan ~174 239 <br />WO 19 Cost Summa S17d 239 $9B.275 $7fi 96d <br />Work Orde~ 20 COMP~E7ER <br />Asbestos Abatement Mana emerrt $39 000 <br />WO 20 Cost Summa t39,009 <br />Work Order 16 CLOSED OUT <br />Demolition Technical S ecifications S6,420 <br />WO 16 Cost Summa 56,42C <br />~~. <br />40~06•001-0 l <br />Pasc 2 <br />P. 3 <br />0'1,':9:~93 <br />