My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Melvin Mark (Files 1-2)
>
CS_Courthouse Square
>
Financial- Melvin Mark (Files 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:34:31 PM
Creation date
8/23/2011 4:16:46 PM
Metadata
Fields
Template:
Building
RecordID
10205
Title
Financial- Melvin Mark (Files 1-2)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br /> e <br />A.B.C. CONSTBO~ION CUSTOMER ~~: 106 ~ <br />~ u-~tKIN VAILEtr ROAD I N V O I C E~k : 1 O O 31 ~ <br />WATSONVILLE, CA 95076 <br />~~~ INVOICE DATE: 03/15/95 ~ <br /> DUE DATE: 04/14/95 . <br />BILL T0: JOB: C106 ^ <br />i <br />William J. Smith <br />Smith Residence <br />^ <br />65666 Bensington Court . 8787 Robbins Court <br />La Honda, CA 95848 Arcadia ^ <br />~~_ ___~-~____~_ <br />CODE DATE DOCUMENT ~~___~__~~_~~ _ <br />DESCRIPTION <br />AMOUNT <br />` <br />_~- ~_ ~____ -- <br />LABOR: ------------------- __ ~_ d~ <br />~ <br />SITE WORK <br />03/04/95 4.00 hrs @ 3 36.15 Operating Engineer 144.60 ~ <br />FRAMING <br />03/04/95 8.00 hrs @ E 12.00 Laborer 96.00 S <br />03/04/95 8.00 hrs @ E 31.00 Carpenter Journeyman 248.00 <br /> -- ---------- ~ <br /> LABOR TOTAL: 488.60 <br />MATERIALS: ~ <br />FRAMING <br />03/03/95 Invoice~~ 88401 Bay Lumber Co. 11,432.00 ` <br /> MATERIAL COSTS: 11.432.00 ^ <br /> 10.0 % OVERHEAD: 1,143.20 <br /> MATERIAL TOTAL: 12.~5.20 = <br />SUBCONTRACTS: <br />FINISHING ~ <br />03/03/95 Invoice~~ 41460 Wilson Enterprises 4,645.00 <br /> SUBCONTRACT COSTS: 4,645.00 S <br /> 15.0 % OVERHEAD: 696.75 <br /> SUBCONTRACT TOTAL: 5,341.75 ~ <br />EQUIP: <br />S <br />SITE WORK <br />03/04/95 4.00 hrs @ E 52.00 510 Backhoe/Loader 208.00 <br /> -- ---------- ! <br /> EQUIP TOTAL: 208.00 <br /> ~ <br /> SUBTOTAL: 18,613.55 <br /> 12.0 q PROFIT: 2,233.63 ! <br />PREVIOUSLY BILLED: 102,169.14 INVOICE TOTAL: 20.847.18 <br /> t <br /> The computer tracks your actual job costs (since last billing) and adds over- ~ <br /> head and profit (you control percentages). Costs may be conveniently added, <br /> ~ <br /> deleted or edited before billings are p rinted Labor billing rates may come <br /> from employee records, craft codes (as shown) or the job record Unposted ~ <br /> payroll may be included on the invoice and itemized by work dat~ <br /> ~ <br /> <br /> ~ <br />C-4 <br /> ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.