Laserfiche WebLink
~~JI~~30-99 WED ?1~15 AM MARION CTY PURCHASING <br />FAX N0~ 91503734379 <br />P, 7 <br />levels will also be measured in the observation wells and in at leasc thtee of the existing on~site ~rt~ot~ito~t-tzg <br />we~ls ducitng the pump test. <br />~'ask 3. Design of Dewatering 5ystem <br />T3ata from the construction oFthe test well and results of the pump test will be used to develop the design <br />$nd constiruckian speci~cat~or~s ~o~' the dewatering system. In addition, a letter report w~ll be prepared to <br />docum~ent our f~di~gs a~d co~,clusio~s. The report wi[1 be signed and stamped by a regastered <br />professional engineec and/or re.gistered geologist. ~ive copaes o~the report wi~l be prov-ded eo you. <br />SCHEDULE <br />We anticipate that construction of the test we1~ c,an begit~ on Tlaursday, June 26, 1997. About S to 10 days <br />will be required to complet~ the test well and observation wells, and to conduct the pum~ test. It is <br />antic~pated that our design recommendatao;~s ar~d ~'eport can be submitted to you withan 2 v~ree~Cs o~ <br />comp~etxon o£the £~e~d work desc~ibed above. <br />FEE <br />We antic~pate that the ~ee for the above work and the terms under which the services wi11 be provided will <br />be on a timo-and-expense basis in accordance with, t~e attac~aed GRI Fee 5chedule and the Cour~ty°s <br />5tandard Consuttairt Agree~tzae~.t. Tl~e estiumated cost aryd recommended budget to complete t~e deslgn of <br />the dewatering system is $25,0001 8$ Ollt1lI1P,(i ~C~OW. <br />~sk ~.. Canstrucbio~ of 1~st Well <br />Test Wetl Arillix~g Subcor-tractor .................................................................... $ 4,500 <br />Observation Well Subcantractot .................................................................... 3,G00 <br />GRi Gealogist--GO hrs (c~ $60/hr ................................................................ .. 3,600 <br />5ubtotal: $ 11,700 <br />~ask 2. ~'utnp ~'est <br />Drilling SubcontcactoX ................................................................................... $ 3,000 <br />GRI Geologist--40 hrs (a3 S60/hr ........................•--........................................ 2,400 <br />Subtota9: $ 5,400 <br />Ta~k 3. Data Analysie, Deaign af Dewater;ng System, and ~teport ..................... $ 6,000 <br />Miscellaneaus Reimbursable Expe~ses .................................................................• $ 2sa <br />~roject Total: $ 23,350 <br />Recommended ~roject Budget: ~ 25~ <br />-3- <br />