Laserfiche WebLink
Provide Mechanical and Electrical revisions per Proposal Request 20, revised, <br />i 15 <br />. <br />Add $ 2,840.00 <br />as per C.O.R. # 178r. <br />Provide Additional Access Card Security Points per Proposal Request 52, <br />~ 16 <br />. <br />Add $ 11,560.00 <br />as per C.O.R. # 179. <br />Provide Lifting Beams to top of West Stairwell per Proposal Request 83, <br />~ ~7 <br />. <br />Add $ 2,870.00 <br />as per C.O.R. # 183. • <br />Provide structural revisions to center Bus Mall Island per Proposal Request 7'1. Slab <br />~ ~8 <br />. <br />area at center island (22'-8" wide x 336' long) will be poured monolithicly with structural slab, <br />Add $ 34,524.00 <br />as per C.O.R. # 185r. <br />Provide Date Stone and Time Capsule per Proposal Request 44, <br />~ ~9 <br />. <br />Add $ 5,743.00 <br />as per C.O.R. # 186. <br />Provide protection board between deck waterproofing and wear slab at ramp per <br />~ 20 <br />. <br />Add <br />Proposal Request 81, per C.O.R. # 187 $ 1,122.00 <br />Delete specified expansion joint system and substitute Tremco expansion joint treatment <br />~ 21 <br />. <br />per attached detail dated 1/4/00. Reference V.E.R. 18, as per C.O.R. # 191 Deduct $ (20,147.00) <br /> $ 314,035.00 <br />~ Total for Change Order No. 19 <br />Not valid un61 signed by both tfie Owner and Archited. Signature ol the Contredor i~dicates agreeme~t herewith, includin9 any adjustment in the ConVad Sum or Contred Time. <br />~ $ 18,459,484.00 <br />The original Contract Sum was $ 342,586.00 <br />1 <br />Net change by previously authorized Change Orders $ , <br />19,802,070.00 <br />The Contract Sum prior to this Change Order was $ 035.00 <br />314 <br />~ The Contract Sum will be (increased) (de~ease~~ by this Change $ , <br />105.00 <br />116 <br />20 <br />The new Contract Sum including this Change Order will be , <br />, <br />The Contract Time will be ~+asfeased} (~es~eased? (unchanged) by 0 calendar days <br />tial Com letion as of the date of this Change Order therefore is <br />tan .............. ...............::::::::::..:::::.~::.;:.;:.;>:.;;:.::.;;:.;:.::.;:.;:.;:>::» <br />The Date of Subs p <br />~ November 27, 2000 <br />::>::>:<:>::>::>:::;::<:>:::~::>:>:::»:«:>:<:::>:~>::>:::;«:>::» <br />r.~~:•• ... <br />r. .. <br /> <br /> <br />,::: :::::::......................... <br /> <br /> <br />.. ::: :.:: :• :::::::::::.:........................ <br />: , •::::.;~ ::::::::: ::::::.;; :•::.;;•::::;•::::.;•::: :;•::::.;~........................... <br />. ...................................................... <br />..,::<•:::;:;:•>:~;;>::::: ~:•>::;::•::;:•::•>:;:•;:•:::;•;:•::;:•::•;:~;:::~:~:::;<.;;;:•;:•>::~::•;:;;;:•::;:;<:;.>:~;::. ~ :::::::. .:::.: .::::::.:..........................: . <br />~t~: ....................................... . <br />~:~:::i:::o;>;:-:•>::~; :.>:n:~::•::~;:~::.::~;;::•::;:•::•:: ~::•::.;:~:::•;;;::•;:~;;::•::>:~;;:~>:~;;;:•::.;:a:•;:~;:~;:•::;;;:•>:~;:~;:•:::~;:~;:::•>~~;::;:::::::::: :~:::::: :•::::::::::. ~::::. ....... ........................................... <br />Owner: Owner: <br />Marion County Salem Area Mass Transit District <br />~ <br />100 High St. NE 3140 Del Webb Ave. NE <br />.. , -- ,.~ „-,-,.,~ ~~~~ <br />Projed Manager: <br />Melvin Mark Development Co. <br />111 SW Columbia, Suite 1380 <br />Portland, ~gon„9j2~1 <br />~ <br />Date <br />Date: <br />File: 982ti-'I'I d <br />J <br />Date: ~l2o~i o <br />~ <br />Page 2 of 2 <br />~ <br />Arbuckle Costic Ar hitects, Inc. Pence/Kelly Construction, Inc. <br />363 State Stree P.O. ox 4109 <br />Salem, Ore 97~01-3~55 Salem, egon 97 02 8109 <br />--. / !/ ~ /) /~1 <br />