Laserfiche WebLink
~ Pence Keliy Construction, inc. <br />< Project: <br />Location: <br />Issue: <br />Courthouse Square <br />Sa1em, Oregon <br />284 PR X78 LEED <br />Cost Estimate Summary <br />Job No.: 9906 <br />Estimator: DH <br />Print Date: 02-Mar-00 <br />COR #: 218 <br />OESCRIPTION QTY UNIT MHlUNIT IABOR <br />HR SIHR LABOR COS Waste <br />•/. SUNITIMAT MAT COST SUB SfUNiT SUB S E~P.SIUNIT EQUIP.f <br /> 0 $ S S S <br />Extended Warran on SF1 8~ 2 1.00 Is 0 S S - S 365.00 S 365.00 5 <br /> o s s a s <br />Clean RTU coils, filters and fans 1.00 Is 0 S S - S 600.00 S 600.00 S <br /> 0 S S S S <br />Chan e 65°k Filters at RTU's 1.00 time 2 2 45 S 90.00 5% S 2,177.28 E 2 286 E S <br /> 0 S S S f <br />Chan e 30% Filters at RTU's 1.00 time 2 2 45 S 90.00 5% S 356.76 S ' 375 S S <br /> 0 S S S S <br />Chan 30% Filters at RA 1.00 time 4 4 45 S 180.00 59L S 408.60 S 429 S S <br /> 0 S S S S <br />Dum ster 1.00 time 0 S 596 S 100.00 S 105 S S <br /> o a s a a <br />Fuel Consum tionAoss SF1 2 22 da 0 S S 14.00 S 308 $ S <br /> 0 S S S S <br />Humidi testin 8 mh 7 8 45 S 360.00 S S S 250.00 <br /> 0 S S E S <br />Extended Warren on trane units 1 Is 0 S S - $ S 5 <br /> 0 S S $ S <br />Trane Tem Start-u 1 Is 0 $ S $ S <br /> 0 S S • S S 5 <br />Write-u IA~ lan/ lan Coor. 1 Is 8 8 65 $ 520.00 S S S <br /> 0 S S S S <br /> 0 S S S S <br />TOTA~S 24 S 1,240.00 S 3,503 S 965.00 S 250 <br />Bo~tl <br />Diroct Cost <br />MU Subcontractor performed work ~ 15~ <br />MU Pence/Kelly pe~formsd work ~ 5X <br />Total Coat <br />36 <br />5,994 <br />14S <br />250 <br />6,388 <br />