My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Pence Kelley
>
CS_Courthouse Square
>
Financial- Pence Kelley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:48:12 PM
Creation date
9/1/2011 4:20:32 PM
Metadata
Fields
Template:
Building
RecordID
10216
Title
Financial- Pence Kelley
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER ANALYSIS <br />+ Summary Shcet <br />Add tcrminal unit to Work Rm 22Cr4. <br />COMPANY <br />CO # 54 <br />A. TOTAL PRICE THIS CHANGE ORDER <br />~ as shown in item 15; <br />B. Scope to be performed: <br />l. See attached documents <br />C. Cost Summary <br />nn~rt.: <br />03/23/0(/ <br />EC Proposal # : 62759-54 <br />Owner's Ref. #: PR-97 <br />1. Total Material Cost (see back-upj <br />2. Total Burdened Labor Cost (see back-up) <br />3. Subcontractors Cost (see back-up) <br />4. Equipment Cost (see back-up) <br />5. Other Miscellaneous Costs (see back-up) <br />6. Small Tool a11ow 0 % of item 2 <br />7. Record Dra~~ings and Submittals <br />8. Warranty Work 0.00 % of direct expenses <br />9. Overhead 10 % <br />10. PROFIT at 0 % <br />11. B&O Tax % WA only <br />12. Sales Ta.~ 0.00 % <br />13. Bond 0.00 % <br />TOTAL PRICE THIS CHANGE ORDER <br />$ 722.00 <br />$ 96.00 <br />560.00 <br />0.00 <br />. <br />0.00 <br />0.00 <br />65.60 <br />0.00 <br />$ 721.60 <br />This change order requires a schedule adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs represented include only those clearly identified at this time. No impact or delay costs are <br />included. Should it be determined at a later date that the project is impacted by multiple scope , <br />changes, or causes beyond our control, those costs may be submitted at that time. Work will commence <br />upon written acceptance by an authorized agent. <br />E C Company <br />Craig Davis PM <br />Authorized Agent <br />