Laserfiche WebLink
GUUKIHUUSC ,~UHKt I <br />RE-CONSTRUCTION REMEDIAL AND CONSTRUCTION OVERSIGHT AC~'IVITIE <br />DRAFT COST ESTIMATE <br />~ <br />General Assumptlons: j <br />Sfte remediaUon acUviUes vnll be conducted prior to construction excavation ~ <br />Remedfal acUvities on the fortner Chevron parcel are not included ~ <br />~ 1-level subsurface garage wiil be consUucted <br />Sal will be excavated to appro~dmately 12 feet bgs for parking garage; therefore, remedial soil exqvations~ <br />will extend to a minimum of 12 feet bgs <br />Remedial excavations will take appro~amately 4 weeks <br />Units rates for contractors are assumed and will be replaced by bid rates ~ <br />TASK I DECOMMISSION USTs <br />Assumptions: <br />The foilowing known UST wiil be decommissioned by removal: Liu Property <br />The fdlowing suspect USTs will be investigated and decommissioned by removal: Senator/Jr. Bootery <br />(muttiple USTs?), Harbison Station, Senator Baler, Beri Building (muttipie USTs?), St. Paul Rectory <br />Five 1,OOO~aI and four 2,000-gal will be removed <br />50 cubic yards/UST of petroleum-contaminated soil will be excavated and disposed off-site <br />4 HCIDs with quantificatioNUST laboratory anatyzed <br />Reporting inGuded in Task VI <br />Project Manager $88 40 53,520 ~$3,520 <br />Geolopist/Enpineer $60 120 57,200 ; $7,200 <br />UST removal 9 ~ $13,000 i 513,000 <br />UST investigation $1,250 3 53,750 I~ 33,750 <br />PCs excavation (cubic yards) S8.25 450 53,713 '$3,713 <br />Sal transportation 521.30 450 59,585 ', $9,585 <br />Soil disposal ~31.50 450 $14,175 ~ 514,175 <br />HCID/quantification analyses 3165 36 $5,940 ~ $5,940 <br />TASK II: SOIL REMOVAL ; <br />~ SaIA '~will~pvated to aPpro~3mately 12 feet bgs for parfdnp garage; therefore, remedial sal excavations~ <br />wiH exkend to a minknum of 12 feet bDs j <br />Five ar~s of Iv~own or wspected PCs wiil be excavated: Se~ator bt, Beri lot, Beri UST, Senator lot sum~, <br />and Goldberp bwldinp sump I <br />5 HCIDs wrth qt~tificatioNewcavat(on laboratory analyzed ' <br />Soil sampies from 4 excavation walls and floor + 1 stxi~'le (~sposa~ analyzed ! <br />S~xnp excavations wal include additlonal analyses far metals, solvents, PCBs (waste components) ' <br />Darratering costa induded in Task IV ~ <br />Repo~ting included'm Task VI .,. <br />1.4 tons/CY for soil '~ <br />ect Manager S88 40 53,520 i~ 53,520 <br />~~r,~~r,~r aso , zo a~,2oo i s~,2oo <br />D/quantification analyses 5165 25 54,125 ~ 54,125 <br />~e components 3424 2 5848 ~ 5848 <br />overburden excavation (cubic yards) 56 720 54,320 ',~ 54,320 <br />~ excavation (cubic yards) 58.25 1480 572,210 ', a12,210 <br />U'ansportation 521.30 1480 a31,524 i 531,524 <br />disposal 531.50 1480 546.620 , 546~620 <br />~ <br />Century West Enflincerinp Page 1 24Ju1-97 <br />