My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. COURTHOUSE SCIUARE - SALEM <br />Y~ncloY ~i~[i~l R ecy Wat Disn Wat ~;y ftec'd/(Paidl Q~1~ X port Cost <br /> <br />SCHNITZER STEEL 10.17 ~640.71 7/ ~ 4/97 ~342.50 <br />~ <br />SCHNIZTER STEEL 6.33 ?.',98.79 7/14/~7 u342.5Q <br />STATON BRICKS 100 ~•^.00 7/3/97 $485.Oa <br />SrATON BRICKS 45 '3 713197 $7_i0.00 <br />STATON BRICKS 35 .? 7/9/97 :~ ~ 42.50 <br />STATON BRICKS 55 ..:..'~0 7/15/97 $285.00 <br />STATON CONC 728 $0.00 7/Z/97 $0.00 <br />W WASTE ASPHALT 93.3 ($950.00) 6/10/97 ~716.25 <br />W WASTE ASPHALT 65.75 ($1,000.00) G/10l97 ~75G.25 <br />W WASTE ASPHALT 126.15 ($950.00) ~!10/97 $756.25 <br />W WASTE CONC 15.6 (.~~0.00) 6/13/97 $ i 02.SQ <br />W WASTE WOOD 25.38 ($594.00) 6/19/97 $650.00 <br />W WASTE WOOD 15.98 ($385.00) 6/19/97 ~325.00 <br />W WASTE WOOD 12.69 ($297.00) 6/19/9"l $325.00 <br />W WASTE WOOD 19.03 ( ~445.50) 6/20/97 $487.50 <br />W WASTE WOOD 15.27 ($358.00) 6/20/97 $325.00 <br />W WASTE WOOD 51.7 ($1,210.00) 6/24J97 $8~0.00 <br />W WASTE WOOD 16.45 ($385.00) 6/24/97 $382.50 <br />W WASTE WO~D 49.45 ($1,182.50) 6/25/97 $730.00 <br />W WASTE WO00 55.35 ($935.00) 6/25/97 $912.50 <br />W VvASTE WOOD 52.07 (a698.50) 6/25/97 $730.00 <br />W WASTE WOOD 43.05 (~577.50) 8/30/97 ~667.50 <br />W WASTE WOOD 71.75 ($962.50) 7/2/97 $912.50 <br />W WASTE WOOD 21.5 ($385.00) 7/3/97 $365.00 <br />W WASTE WOOD 21.55 (~385.00) 7/3/97 $365.00 <br />W WASTE WOOD 51.66 ($693.00) 7/7/97 $730.00 <br />W WASTE WOOD 11.07 ($148.50) 7/17/97 $182.50 <br />~ <br />W WASTE WOOD 14.35 ($192.50) 7/18/97 $182.50 <br />W WASTE WOOD 14.35 ($192.50) 7/18/97 $182.50 <br />W WASTE WOOD 72.57 (~961.00) 7/21 /97 $907.50 <br />W WASTE WOOD 14.35 ($192.50) 7/21/97 $151.25 <br />W WASTE WOOD 57.4 ($770.00) 7/21/97 $605.00 <br />W WASTE WOOD 24.6 ($33~.00) 7/22/97 $182.50 <br />W WASTE WOOD 28.7 ($385.00) 7/22/97 $182.50 <br />SUM: SUM: SUM: SUM: SUM: <br />3658.92 600.97 279 ($8,427.44) $35,503.62 <br />TOTAL WGT ' 4259.89 <br />% RECYCLED 85.89% <br />~ <br />prepared by: STATON CONSTRUCTION iNC <br />
The URL can be used to link to this page
Your browser does not support the video tag.