Laserfiche WebLink
Time Lapse Photography <br />, 4-15 Randy C. has contacted Equitable Building management and they are not opposed to the <br />~ placement of a rooftop camera, depending on the type of equipment and required access. <br />BUILDING SYSTEMS <br />Building Commissioning <br />3-25 The draft commissioning RFP is in the process of being reviewed and revised. REV. 4-1 <br />Randy C. indicated that Bob McCune would be the contact with OOE. REV. 4-15 Bob M. <br />met with Roger Mosier and has requested additional information from Leonard. <br />Mechanical <br />3-18 Randy C. has a meeting with Trane on 3-19 to discuss centralized control systems. REV. 3- <br />25 Randy met with Trane and is reviewing the information he received. <br />Electrical <br />4-1 Billy is attempting to assess hookup costs and has been exchanging phone messages with <br />PGE. REV. 4-15 Byron indicated that a PGE transformer easement may still exist within the <br />vacated alley. ACTION: Billy will refer the issue to Marion Co. legal department. <br />ONGOING ISSUES <br />TOD Progam Review <br />4-15 Patti Milne has suggested that the owners create a north end opportunity site steering <br />committee comprised of interested business and citizen's groups. <br />FTA Approvals <br />1-28 Transit is expecting a response to their request to purchase the TOD site with local funds. A <br />response is expected by 2-5. REV. 3-11 John reiterated that FTA has been provided all of the <br />information necessary to provide a response. <br />Value Engineering Cost Sharing <br />3-11 P/K proposed that the Owner's consider a 50%/50% split on value engineering savings that <br />are generated by P/K and approved by the County and Transit. The owners will consider such <br />an agreement. A decision will be tabled until the 4-16 partnering meeting. REV. 4-1 Randy <br />is unable to find an owner who has utilized a contractor-generated cost savings split. REV. 4- <br />29 Billy and John have researched the legal / FTA perspectives on cost sharing. There <br />appears to be nothing that prohibits a cost savings arrangement, and FTA appears to be <br />supportive of the concept. <br />PGE Energy Study <br />3-11 The County is waiting for a response to the energy study contract from PGE. <br />NEW ITEMS <br />~ <br />3 <br />