asked if it was possible to be bidding parking structure and then start the day after the <br />~ August 15'~ deadline and have a 15 day window built in. Curt had the same thoughts. If <br />there are no problems, then we are ready to go. <br />Construction documents are in progress. Leonard is working on the dd set and should be <br />ready in mid July. The issue is would you want to put up for bid at the same time for dd <br />package for shell, assuming we can do both together. The window to finish cd drawings <br />on parking structure is not as tight. Curt has to do the numbers on the parking structure <br />and do the entire building frame at the same time as looking at bids on dd package for <br />shell. Dave visualizes bid package #1 to include complete structure package to top, <br />excavation, mechanical package, waterproofing package. <br />It was suggested that RG and Ra.ndy work with the city on getting multiple permits. <br />Architect and contractor have used both working with city staff and also the option of <br />using outside consultants who worked with city to accept their recommendations. Ra.ndy <br />has already been in contact with city management and the dialogue has been opened in <br />this area. <br />The street scape portion of the project will come in towards the end. The invoice for this <br />portion will be pulled out and the city will pay direct. It needs to be included in the gmp <br />and the County will collect at the appropriate time. There is a budget item set up for this <br />and no red flags as yet. <br />~ The question was asked what does the gmp mean at this point. Curt responded that the <br />scope of work we bid out will be guaranteed. With regard to the ti's, the allowance will <br />be spelled out as an allowance. The county needs to work on that portion. <br />The goal now is to build the project as a single unit and not take components out. There <br />is a need for a meeting with Centurywest. On September 1 if site is ready and clean do <br />we take any advantage of window to reduce risk, identify costs and firm up gmp. June <br />is better idea. Legal Counsel is moving along in regazd to Chevron and Statesman <br />Journal situation regarding possible injunction. <br />Discussions turned towards relationships in documentation. It is difficult to know about <br />the development agreement as it will depend on Dan's role in the project. Things could <br />look different for him. This situation will be resolved in the next couple of day. The <br />target date of June 1 for project documentation item #3, changes to July 1. <br />Randy will redo the time schedule dates for everyone and will get input from the <br />architect for their timeline as well. <br />Meeting adjoumed. <br />~ <br />7 <br />