Laserfiche WebLink
~ COURTHOUSE SQUARE INC. <br />340 VISTA AVE SE <br />SALEM OREGON <br />Fax 503-364-1453 <br />TO: Project Team Leaders <br />FROM: Dan Berrey, Project Coordinator <br />DATE: March 26, 1997 <br />RE: Design Team Meeting 3/27/97 <br />PROJECT UPDATES <br />IZndate from Contractor: <br />Review from Curt Pence / Dave Hays: <br />Review: <br />Update on Dewatering issues with GRI <br />DEQ Permits required. Timing of permit. <br />Conference call with Tom Gainer. <br />Verify depth of excavation: 18ft. vs. 25ft. <br />~ Review cost associated with design changes on following areas: <br />East Wing: 30 ft. grid design: <br />Increase in size: 4,588 vs. (13,764 Total) <br />Add onto 3rd Floor/ Chemeketa Wing. (4,841 Total). <br />Plus mechanical room. <br />Update on Civil Design work: Start:2/13 / Finish: 5/2 <br />Structwal Design work: Start: / Finish: 6/4/97 <br />Parl~ng Structure: <br />Currently working on design options for 423 to 448 stalls. <br />Review efficiency numbers on the 363 vs 355 stall count. <br />Review time line of parking structure as well as cost for the work over the next 60 <br />days. <br />~ <br />