Laserfiche WebLink
<br />~ ITEM 3: SteeVConcrete j <br />There was discussion around whether to design the structure with steel or concre e. The cost of <br />materials is almost identical, but it would cost an additional $SOOk to fireproof steel. This is a direct <br />shell cost savings. Leonard pointed out that there are some pros and cons to concret vs. steel. We <br />are dealing with a seismic 3 zone. Steel has always considered best for dealin with seismic <br />conditions. There are new concrete techniques can deal with it. The noise level and ibrations from <br />transit buses running through the center of the building need to be considered. B increasing the <br />mass, vibration is dampened and noise is reduced. On that basis, Leonard suggests hat we would <br />be better off with concrete structure. Steel allows for bounce with a certain amou t of deflection <br />built into the structure. Vibrations can be felt throughout the building. Most of these vibrations will <br />translate down through the parking structure, but the walls around the space will s ill conduct the <br />noise. It was noted that vibrations and noise will make the building unattractive t tenants. It is <br />critical that the building minimizes noise and vibration in the office space. Th re was further <br />discussion around whether we had to go with only one, or if both could be inco orated. Curt <br />suggested there is some economy savings by using concrete. , <br />Randy said that this discussion has defined what we need out of the building and w are relying on <br />the architect to advise us as to what would be the best materials. We are looking fo the best price <br />that meets the defined performance standards. i <br />Decision: Concrete II~ <br />I <br />Curt asked for discussion around waterproofing the concrete in the parking structure. II~, He stated that <br />there is no practical reason to do this. '~, <br />Decision: further investigation <br />ITEM 5: Fifth Floor <br />Dan distributed a summary of the fifth floor option (see attached). The net cost of th fifth floor, as <br />it relates to transit, is a savings of $79k. The savings for the county is $400k. The ost of parking <br />will increase by $600k. The parking cost does not decrease, but the cost per stall is igher because <br />they will have to excavate a deeper hole. This will take out a lane of traffic from t street during <br />the excavation process. Dan is still exploring some issues around parking. With a ingle level we <br />are not at 345 - 355 parking spaces, we are at 332. This will increase by 13 with t e new atrium <br />design. The parking structure may not be adequate for the four-floor design. Aside om the market <br />issue, Dan stated that there may be a be a code issue. RG said that there is no ode regarding <br />downtown parking. You can build a building without parking in the downtown area. Dan said that <br />there are still some options to explore. The current design is to the property line not the curb. <br />Leonard explained we are permitted to go to the curb, but the code says that you have i o sign off that <br />you will give it back if the city should want to do something with the curb area. I <br />ACTION: Dan will give Randy more information on Friday. <br />It was asked if Dan buys the air space if he puts on a fifth floor, what does this do to ~he percentage <br />~ and how would this be put into the contract to assure FTA that he is not going to buil in that space. <br />