Laserfiche WebLink
P~'~g level layout: Alan discussed vertical penetration. He will o ah I <br />~,r and send it to Mike and allow him to be • g ~and do a layout <br />hammering them to have our number g~ worku~g wi~ ~at, D~ 'I,~~ we are still <br />s by November 15. ~ <br />Des~gn Updates ' <br />Rachael reported that she is meeting with the ciry tomorrow on Cityscape 'ssues. <br />agt'ee with all the suggestion, with a few minor adjustments to ~e ~, ' They've <br />is continuing to do research on the clock tower design and will be 1 king at C othe s our~ for <br />the clock, instead of the Mt. Angel clock, which the city wants for the water ont. <br />Presentation materials ! <br />Alan reported that they aze working on 3D studies, and will continue to develop 'the presentation <br />materials in the next few weeks. They are looking at the design for the confere <br />space and design concepts, center, work <br />RG asked that the design team be careful not to make any outside presentatio to oth <br />agencies before they present the design to the BOC and city council. ~ er city <br />I <br />RG reported that he met with ODOT this week, They asked if there was space t~ put a heli ort <br />on the rooftop, Alan responded that this can be done, for a price. ~ p <br />~ 14'ansit Update '~~ <br />Dan reported that in the meeting with the consultants, there was discussion on I eatin the bus <br />mall. RG discnssed this in his meeting with ODOT. Radiant heaters were d' ussed for use <br />in the outside bus mall waiting area, Alan addressed the movement of air in e breezewa , <br />Alan reported that there may be a way of taking some enhaust air off the heate s, seasonally, <br />and for evaporating moisture faster. Y <br />Adjourned ~ <br />